水電安裝工程施工方案

篇1

【關(guān)鍵詞】水電安裝工程 質(zhì)量問(wèn)題防范措施

【 abstract 】 as people life level, what living environment asks is more and more high, for hydropower installation project bring new tasks and new challenges. And as the whole building engineering important part of the hydropower installation engineering quality is essential, once appear quality problem not only relationship hydropower installation project but also will affect the whole project quality. According to the analysis of the status of quality hydropower installation engineering problems, and connecting with the reality of preventive measures are reasonable Suggestions.

【 key words 】 hydropower installation engineering quality problem preventive measures

中圖分類號(hào):TV547.3 文獻(xiàn)標(biāo)識(shí)碼:A文章編號(hào):

前言

水電安裝工程不但是整個(gè)工程重要組成部分,其質(zhì)量?jī)?yōu)良還關(guān)系著以后建筑投入使用的質(zhì)量。隨著建筑事業(yè)高速發(fā)展,各種項(xiàng)目逐漸增多,各個(gè)施工單位對(duì)水電安裝工作質(zhì)量越發(fā)重視。就目前水電安裝工程質(zhì)量現(xiàn)狀來(lái)看,仍然存在諸多急需完善與改進(jìn)的問(wèn)題,比如滲堵的排水、漏氣等等質(zhì)量問(wèn)題,都會(huì)給使用人們帶來(lái)極大不便,因此探討水電安裝工程質(zhì)量問(wèn)題具有實(shí)際意義。

水電安裝工程質(zhì)量問(wèn)題

在整個(gè)建筑之中,水電安裝工程質(zhì)量至關(guān)重要。但是從實(shí)際情況可知,目前水電安裝工程質(zhì)量存在較多問(wèn)題,本文就結(jié)合現(xiàn)狀探析水電安裝工程質(zhì)量存在的問(wèn)題。

2.1,對(duì)水電安裝工程的質(zhì)量重視不夠

目前施工中存在一個(gè)普遍現(xiàn)象就是施工企業(yè)認(rèn)識(shí)上存在誤區(qū),片面認(rèn)為建筑主體比較重要,而水電安裝工程隨便怎么都可以,只要過(guò)得去就行了。對(duì)進(jìn)行水電安裝具體施工時(shí),許多企業(yè)都將這項(xiàng)工程分包出去或者轉(zhuǎn)給其他的施工隊(duì)伍,一旦遇到分包隊(duì)伍或者轉(zhuǎn)包單位缺乏相應(yīng)資質(zhì),或者沒(méi)有一個(gè)嚴(yán)格標(biāo)準(zhǔn),勢(shì)必導(dǎo)致質(zhì)量問(wèn)題出現(xiàn)。有一些水電安裝施工人員素質(zhì)差,而且技能上也僅僅略懂一二,對(duì)水電安裝要點(diǎn)及流程都不熟悉,都會(huì)出現(xiàn)質(zhì)量問(wèn)題。比如給水管道安裝過(guò)程中,安裝不到位,造成的滲漏;預(yù)埋管線預(yù)埋定位不準(zhǔn)確造成管線在澆筑混凝土樓板或砌筑墻體時(shí)突出地面或墻面等等。筆者就遇到一個(gè)施工隊(duì)伍,居然連強(qiáng)弱電線路都走錯(cuò)。

2.2,缺乏科學(xué)的管理

對(duì)工程施工進(jìn)行科學(xué)管理是確保水電安裝質(zhì)量重要舉措,但是在現(xiàn)實(shí)之中許多監(jiān)理根本就沒(méi)有盡其管理職責(zé)。有時(shí)候施工隊(duì)伍沒(méi)有按照流程操作,監(jiān)理也視而不見(jiàn),其管理僅僅流于形式,致使施工人員在安裝電線通路及排水管之時(shí)缺乏規(guī)范性,致使水電安裝工程質(zhì)量下降。

2.3,水電安裝與土建不配合

事實(shí)上,只有土建和安裝兩個(gè)程序緊密聯(lián)系,協(xié)調(diào)配合才能增強(qiáng)水電工程質(zhì)量。但是現(xiàn)實(shí)之中卻不是這樣,許多土建施工人員根本就沒(méi)嚴(yán)格按照?qǐng)D紙,該預(yù)留空間的沒(méi)留空間,導(dǎo)致水電安裝施工中不得不再次鑿墻挖洞埋設(shè)管道,勢(shì)必破壞建筑物原本的結(jié)構(gòu),為未來(lái)的使用者帶來(lái)安全隱患,這種現(xiàn)象應(yīng)該是目前導(dǎo)致水電安裝質(zhì)量問(wèn)題主要原因之一。

2.4,一些特殊問(wèn)題

1)安裝排水管問(wèn)題;在水電安裝中,排水方面出現(xiàn)的問(wèn)題基本集中在漏水、滲水及堵塞。漏水與滲水問(wèn)題大都集中在水管的質(zhì)量上,但是有一些土建不符合規(guī)格導(dǎo)致低級(jí)不均勻,可能讓水管受力不均勻出現(xiàn)破裂而漏水或滲水。而堵塞根本原因在于排水管內(nèi)部清理不到位,施工之時(shí)施工人員又沒(méi)有進(jìn)行通球試驗(yàn),安裝之后出現(xiàn)了管道堵塞。

2)安裝電氣問(wèn)題;水電安裝工程中,電氣也經(jīng)常出現(xiàn)問(wèn)題的一個(gè)重要方面,具體表現(xiàn)在如下幾個(gè)方面:

①設(shè)備材料的質(zhì)量不符合標(biāo)準(zhǔn);現(xiàn)在很多施工隊(duì)伍和賣設(shè)備商人都有聯(lián)系,購(gòu)買一套就提多少成。因此有時(shí)候就會(huì)混雜進(jìn)去一些不合法標(biāo)準(zhǔn)的電氣設(shè)備,必將造成水電安裝質(zhì)量出現(xiàn)問(wèn)題。還有一些是采購(gòu)時(shí)麻痹大意,沒(méi)有嚴(yán)格審查材料來(lái)源及質(zhì)量,流入一些不符合要求的設(shè)備。這些設(shè)備安裝好之后,必然會(huì)帶來(lái)安全隱患。

3,水電安裝工程質(zhì)量防范措施

確保水電安裝工程質(zhì)量就是保障整個(gè)建筑質(zhì)量,因此必須要從水電安裝存在質(zhì)量問(wèn)題入手,做出相應(yīng)的防范措施。

(1)嚴(yán)格審核施工圖紙;施工之前必須要嚴(yán)格審核水電安裝圖紙,這是施工中一個(gè)比較重要的工作,這項(xiàng)工作做得是否到位直接關(guān)系著水電安裝質(zhì)量。在審核圖紙時(shí)要按照相關(guān)標(biāo)準(zhǔn),仔細(xì)查看各個(gè)部位設(shè)計(jì)是否科學(xué),盡量發(fā)現(xiàn)存在問(wèn)題并且及時(shí)修改與解決。因?yàn)檫@個(gè)時(shí)候出現(xiàn)了問(wèn)題,修改是十分便利的。筆者在審核圖紙時(shí)曾經(jīng)發(fā)現(xiàn)安裝水管位置與現(xiàn)場(chǎng)有差距,及時(shí)到現(xiàn)場(chǎng)核實(shí)并做了修改。

2)對(duì)控制技術(shù)進(jìn)行交底;在施工之前就要對(duì)所有參數(shù)施工人員進(jìn)行技術(shù)交底,讓他們對(duì)整個(gè)工程基本情況做一個(gè)了解與掌握,比如技術(shù)要求、工程特點(diǎn)、施工工藝以及質(zhì)量標(biāo)準(zhǔn)、安全措施等等。這樣就可以讓施工人員明白自己負(fù)責(zé)工作更加明確,心中對(duì)各項(xiàng)技術(shù)有數(shù)。

3)設(shè)計(jì)施工方案;水電安裝不同于其他工程,它具備了一定功能性與多方關(guān)聯(lián)性,安裝之時(shí)要求較高材料質(zhì)量,同時(shí)還要求嚴(yán)格的技術(shù)要求。根據(jù)這些特點(diǎn),就要合理設(shè)計(jì)施工方案,對(duì)設(shè)計(jì)的設(shè)備、管材等都要做出具體說(shuō)明。

4)控制設(shè)備及材料質(zhì)量;無(wú)論是那種工程施工,第一道關(guān)口就是設(shè)備與材料的質(zhì)量,這是確保水電安裝工程質(zhì)量的首要條件。

5)控制水電安裝過(guò)程的質(zhì)量;控制水電安裝過(guò)程的質(zhì)量,是確保整個(gè)工程整體質(zhì)量的重要依據(jù)。在該過(guò)程中,一定要熟悉整個(gè)安裝工藝與流程,嚴(yán)格要求施工人員按照施工上的要求進(jìn)行施工,切實(shí)做好電力施工各個(gè)項(xiàng)目,比如布線、安裝插座以及安裝排水管道等。并要及時(shí)進(jìn)行試驗(yàn),不合格就要進(jìn)行檢修甚至返工。本文就以兩個(gè)例子進(jìn)行適當(dāng)闡述。

①家庭里電器使用的布線要使用中策BV單股銅線,接地線采用bbr軟銅線。穿PVC走向要做橫平豎直,沿著平頂?shù)膲亲摺9軆?nèi)的布線不能夠有接頭、扭結(jié)等,如下圖:

圖1水電安裝施工

②電視線、電話線安裝的時(shí)候千萬(wàn)不能夠封閉或移動(dòng),還要嚴(yán)禁導(dǎo)線與弱電線安裝在同一個(gè)管道中,管線均要從地面直墻角過(guò),如下圖:

圖2 水電安裝施工

③對(duì)于水電安裝工程來(lái)說(shuō),安裝電線非常重要,因?yàn)殡娋€中有低壓照明電。安裝的時(shí)候一定要做好區(qū)分,不然造成短路引發(fā)火災(zāi),對(duì)生命、財(cái)產(chǎn)都會(huì)造成威脅。具體安裝如下圖:

圖3水電安裝施工

6)制定出完善的工程質(zhì)量控制標(biāo)準(zhǔn);必須要制定出完善嚴(yán)格質(zhì)量管理標(biāo)準(zhǔn),根據(jù)質(zhì)量管理措施進(jìn)行實(shí)施,必須要明確施工人員所負(fù)責(zé)質(zhì)量標(biāo)準(zhǔn),嚴(yán)格按照規(guī)定進(jìn)行作業(yè)。而且完工驗(yàn)收時(shí),還必須對(duì)相關(guān)開(kāi)關(guān)、配電箱、插座、燈具以及給排水管道等進(jìn)行驗(yàn)收,發(fā)現(xiàn)了不符合要求的地方馬上進(jìn)行整改甚至返工。

4,結(jié)束語(yǔ)

隨著人們生活質(zhì)量增強(qiáng),工程的高質(zhì)量是發(fā)展趨勢(shì)。因此必須要根據(jù)現(xiàn)狀分析出水電安裝工程質(zhì)量存在的問(wèn)題,并有針對(duì)性的制定出相應(yīng)的防范措施,提高水電安裝質(zhì)量為人們營(yíng)造一個(gè)安全可靠工作生活環(huán)境。

【參考文獻(xiàn)】

[1]方炳.淺論建筑水電安裝的質(zhì)量控制方法[J].價(jià)值工程,2010(1):69-72.

[2]趙成.淺談水電安裝工程質(zhì)量控制的幾點(diǎn)意見(jiàn)[J].土木建筑學(xué)術(shù)文科,2010(14):395-398.

[3]梁玉升.淺析建筑水電安裝工程質(zhì)量控制要點(diǎn)[J].城市建設(shè)理論研究,2011(14):165-167.

篇2

關(guān)鍵詞:建筑;水電安裝;質(zhì)量管理

Abstract: Water and electricity installation engineering and people's production and life are closely related, how to ensure the construction of hydropower installation quality, which will be of important significance. This paper analyzes the construction and some problems with the installation in the process of construction, and put forward the existing problems of hydropower installation quality management measures.

Key words: construction; hydroelectric installation; quality management

中圖分類號(hào):TL372+.3

建筑水電安裝工程質(zhì)量影響著人們的工作和生活,對(duì)建筑工程質(zhì)量有著長(zhǎng)期的影響,是建筑工程質(zhì)量的一個(gè)比較重要的組成部分之一,對(duì)于水電安裝工程質(zhì)量管理國(guó)家和地方都相繼做出了一些規(guī)定,但是在目前的建筑水電安裝工程中還存在著一些質(zhì)量問(wèn)題。本文主要分析了建筑水電安裝工程施工過(guò)程中存在的一些問(wèn)題,并且針對(duì)存在的問(wèn)題提出了水電安裝質(zhì)量管理的科學(xué)措施。

1 建筑水電安裝質(zhì)量存在的一些問(wèn)題

近年來(lái),隨著我國(guó)建筑行業(yè)的快速發(fā)展,有些施工單位為了按期完成任務(wù),對(duì)建筑工程的質(zhì)量有所忽視,這樣也就造成已經(jīng)交付使用的建筑工程項(xiàng)目排水、電氣工程存在著漏電、開(kāi)光不靈、滲、漏、堵等方面的質(zhì)量問(wèn)題,這些問(wèn)題不但造成能源的浪費(fèi),而且還對(duì)建筑工程的使用造成一定的影響。筆者根據(jù)自己在施工工程中的一些體會(huì),對(duì)建筑水電安裝工程質(zhì)量管理方面進(jìn)行如下分析。

1.1建筑水電安裝工程中的電氣質(zhì)量問(wèn)題

建筑水電安裝工程的電氣質(zhì)量方面的問(wèn)題主要包括燈具沒(méi)有很好地固定、地線連接不做壓接、安裝的電氣開(kāi)關(guān)不符合標(biāo)高、配管與配箱連接方法不符合要求、在施工的過(guò)程中沒(méi)有科學(xué)使用設(shè)備和材質(zhì)等等。造成燈具沒(méi)有牢固固定、地線連接不做明敷護(hù)套管槽、壓接,主要原因是燈具在安裝時(shí)貪圖便宜使用了不合適的連接方法、使用了木楔以及管槽敷設(shè)造成。

1.2建筑水電安裝工程中排水質(zhì)量方面存在的問(wèn)題

給排水質(zhì)量問(wèn)題是建筑工程水電安裝質(zhì)量問(wèn)題中比較常見(jiàn)的問(wèn)題之一。建筑水電安裝工程中的給排水質(zhì)量問(wèn)題主要是:給排水管滲水、漏水;支架不全或者松動(dòng);給排水管的安裝位置不符合要求;給排水管道堵塞等等。引起這些問(wèn)題的原因主要有以下幾個(gè)方面:由于地基的沉降不均勻從而造成下水管斷裂、滲漏;施工中所用的給排水管厚度存在不均勻現(xiàn)象,有些還存在砂眼或者裂縫;建筑水電安裝工程中安裝不完全按照規(guī)程造成承插接口不密實(shí)、有縫隙等等。

2針對(duì)建筑水電安裝工程質(zhì)量存在的問(wèn)題應(yīng)采取的質(zhì)量管理措施

2.1認(rèn)真做好建筑水電施工所用設(shè)備和材料的質(zhì)量管理

水電安裝施工過(guò)程中所用的設(shè)備和材料是保證水電安裝工程質(zhì)量的重要條件,做好水電安裝工程質(zhì)量管理首先就要做好設(shè)備和材料的采購(gòu)和選型,如果設(shè)備和材料存在問(wèn)題在水電安裝施工過(guò)程中是不能進(jìn)行彌補(bǔ)的。施工人員要在管材進(jìn)場(chǎng)時(shí)應(yīng)當(dāng)認(rèn)真與工程監(jiān)理做好配合,做好管材的抽檢工作,努力做好施工設(shè)備和材料的質(zhì)量關(guān),進(jìn)場(chǎng)的管材不合格的不得使用,不得進(jìn)場(chǎng),做好驗(yàn)收工作以及復(fù)試工作,進(jìn)場(chǎng)的設(shè)備和原材料必須符合相關(guān)的國(guó)家規(guī)定,在質(zhì)量、規(guī)格、型號(hào)、材質(zhì)等方面必須符合設(shè)計(jì)的要求,并且要有出廠合格證。例如絲扣不能出現(xiàn)損傷,管壁的厚度應(yīng)當(dāng)均勻一致而且偏差也應(yīng)當(dāng)在一定的范圍以內(nèi),管道不能有砂眼和裂縫現(xiàn)象。要嚴(yán)防衛(wèi)生器具接口不合格的情況發(fā)生,塑料管閘閥一定要避免關(guān)不嚴(yán)的情況發(fā)生,應(yīng)當(dāng)使用再生材料,鍍鋅管內(nèi)部也一定要鍍鋅。經(jīng)檢驗(yàn)不合格的材料應(yīng)當(dāng)采取降級(jí)處理、拒收或者及時(shí)予以糾正。

2.2認(rèn)真做好施工圖紙和施工方案的審核工作

在建筑水電安裝過(guò)程中,認(rèn)真對(duì)施工方案和施工圖紙進(jìn)行審核是以后安裝工程順利進(jìn)行的重要保證,也是技術(shù)準(zhǔn)備工作非常重要的內(nèi)容。通過(guò)認(rèn)真對(duì)建筑水電安裝工程施工圖紙和施工方案的審核可以為進(jìn)行修改做好準(zhǔn)備,對(duì)于存在的問(wèn)題可以很好地得到解決。建筑水電安裝施工圖紙是進(jìn)行水電安裝施工的重要依據(jù)和前提,要認(rèn)真對(duì)施工圖紙進(jìn)行審核,要做到對(duì)施工的各個(gè)階段有所熟悉,一旦出現(xiàn)問(wèn)題能夠及時(shí)進(jìn)行糾正,使水電安裝工程質(zhì)量得到科學(xué)管理。根據(jù)水電安裝特點(diǎn),主要從以下幾個(gè)方面進(jìn)行審圖:①要認(rèn)真核對(duì)系統(tǒng)圖是否與平面圖一致,管線的交叉、管線的標(biāo)高以及坐標(biāo)是否符合規(guī)定,是否存在漏、碰、錯(cuò)的情況,對(duì)不明白的地方以及錯(cuò)誤的地方要及時(shí)向有關(guān)單位和設(shè)計(jì)院聯(lián)系,共同找出科學(xué)合理的解決方案。②審圖應(yīng)按照工程特點(diǎn)分項(xiàng)進(jìn)行,再對(duì)各分項(xiàng)之間進(jìn)行分析看是否存在問(wèn)題,然后再審查分部工程之間有沒(méi)有矛盾,最后要做的是把審查出的問(wèn)題進(jìn)行討論,制定出科學(xué)的解決方案。③收到圖紙后首先對(duì)圖紙完整情況進(jìn)行核對(duì),從而避免窩工的現(xiàn)象發(fā)生。對(duì)水電安裝設(shè)計(jì)圖紙進(jìn)行查看是否符合技術(shù)標(biāo)準(zhǔn)和規(guī)范規(guī)定。認(rèn)真做好施工現(xiàn)場(chǎng)的預(yù)埋、預(yù)留工作,在實(shí)際的施工過(guò)程中,要根據(jù)詳圖進(jìn)行預(yù)埋、預(yù)留工作,并且要做好檢查。

施工圖紙應(yīng)當(dāng)按一定順序進(jìn)行科學(xué)地編制,但是由于設(shè)計(jì)人員在利益的驅(qū)使下,造成設(shè)計(jì)出來(lái)的圖紙質(zhì)量不好,再加上一些設(shè)計(jì)人員專業(yè)技術(shù)水平有限,再加上審核人員不認(rèn)真,設(shè)計(jì)出來(lái)的施工圖紙質(zhì)量就不可能很高。為了避免在建筑水電安裝施工過(guò)程中出現(xiàn)問(wèn)題,在水電安裝施工前應(yīng)當(dāng)把圖紙中的存在問(wèn)題消除。建筑水電安裝項(xiàng)目主要技術(shù)負(fù)責(zé)人要對(duì)圖紙親自進(jìn)行審核并將意見(jiàn)提交到圖紙會(huì)審小組進(jìn)行討論,然后與甲方和設(shè)計(jì)院進(jìn)行協(xié)商、討論,從而實(shí)現(xiàn)問(wèn)題的解決。如果通過(guò)會(huì)審需要對(duì)原圖紙的設(shè)計(jì)進(jìn)行修改時(shí),要認(rèn)真做好標(biāo)識(shí),例如修改日期、修改人、修改依據(jù)。

2.3認(rèn)真做好建筑水電項(xiàng)目施工工程中的質(zhì)量管理

2.3.1認(rèn)真做好技術(shù)交底工作

建筑水電安裝施工進(jìn)行技術(shù)交底的主要目的是水電安裝的施工人員對(duì)施工對(duì)象的技術(shù)安全措施、質(zhì)量標(biāo)準(zhǔn)、施工工藝、技術(shù)要求、結(jié)構(gòu)特點(diǎn)、設(shè)計(jì)情況等方面做一全面了解,從而有效避免操作錯(cuò)誤和技術(shù)錯(cuò)誤。進(jìn)行水電安裝項(xiàng)目施工技術(shù)交底主要是把水電安裝工程施工注意事項(xiàng)、特點(diǎn)、要求、意圖等問(wèn)題,另外還有為施工應(yīng)采取的技術(shù)措施、制訂的技術(shù)方案,應(yīng)當(dāng)全部向施工工人和技術(shù)人員進(jìn)行詳細(xì)的交底,例如施工要求達(dá)到的質(zhì)量目標(biāo)、卡子的距離和形式,連接方式,垂直度,管道坡度等都要有詳細(xì)的要求。這樣施工的任務(wù)得到了明確,水電安裝工程的質(zhì)量有了保證。

進(jìn)行技術(shù)交底要有針對(duì)性,要針對(duì)工藝設(shè)備、工程的特點(diǎn),真正做到能夠指導(dǎo)施工。工長(zhǎng)最直接的工作也就是技術(shù)交底,交底時(shí)決不能用“按照驗(yàn)收規(guī)范、設(shè)計(jì)圖紙施工”的語(yǔ)句進(jìn)行技術(shù)交底,而是應(yīng)當(dāng)對(duì)控制點(diǎn)有所把握,例如管線安裝時(shí)注意的防腐、坡度、支托架形式、架、固定卡、連接方式等寫清楚,同時(shí)還要做出一些規(guī)定要求操作者按這些要求去操作。在進(jìn)行技術(shù)交底時(shí)還應(yīng)當(dāng)對(duì)質(zhì)量等級(jí)寫清楚,避免返工情況發(fā)生。

2.3.2確保建筑水電安裝工程嚴(yán)格按照規(guī)范要求進(jìn)行施工

在建筑水電安裝過(guò)程中,要保證水電安裝工程的質(zhì)量,要定期進(jìn)行施工質(zhì)量檢查,對(duì)于施工中存在的問(wèn)題進(jìn)行及時(shí)的糾正,保證水電安裝施工質(zhì)量符合設(shè)計(jì)要求,施工人員應(yīng)當(dāng)按照有關(guān)要求進(jìn)行施工,并且要認(rèn)真做好質(zhì)量驗(yàn)收工作。建筑水電安裝工程主要涉及到的施工質(zhì)量標(biāo)準(zhǔn)主要有以下兩個(gè):①給排水管道質(zhì)量施工標(biāo)準(zhǔn)。管道與管道、器具與管道連接應(yīng)嚴(yán)密,不允許有滲漏發(fā)生;給排水管安裝與燃?xì)夤艿馈㈦娫吹木嚯x不得小于50mm;管道的坡度設(shè)計(jì)要符合有關(guān)要求;在管道的螺紋連接處一部分應(yīng)當(dāng)設(shè)置管卡并且要牢固安裝,25mm以下管徑的給排水管道在管道終端100mm處、角閥、水龍頭、水表處必須加以固定。②電氣施工質(zhì)量標(biāo)準(zhǔn)。燃?xì)夤芘c電氣開(kāi)關(guān)接頭間的距離要大于150mm,燃?xì)夤艿琅c導(dǎo)線的間隔要大于50mm;線路連接必須正確,電線的離地的高度要大于200mm,落地插座必須有較好的保護(hù)蓋板,電器連接要可靠;對(duì)于有地線插孔的插座,面對(duì)電源插座,插座右孔接火線,左孔接零線,地線孔在正上方。

參考文獻(xiàn):

[1]朱笑.水電安裝工程管理與施工質(zhì)量的措施[J].城市建設(shè)理論研究,2011(16).

[2]韓冰.水電工程質(zhì)量管理要素分析[J].城市建設(shè)理論研究,2011(35).

篇3

【關(guān)鍵字】水電安裝;工程質(zhì)量;預(yù)防控制

引言

隨著社會(huì)經(jīng)濟(jì)的飛速發(fā)展,對(duì)于居住環(huán)境居民也開(kāi)始提出更高的要求,尤其是在建筑水電安裝方面,對(duì)于建筑工程質(zhì)量來(lái)說(shuō)其是非常重要的組成元素之一,它與居民日常生活品質(zhì)有著十分緊密的聯(lián)系。本文就將分析探討安裝過(guò)程里面質(zhì)量影響因素和問(wèn)題,并且對(duì)這些問(wèn)題提出相對(duì)的措施進(jìn)行控制。

1、控制水電安裝質(zhì)量的意義

隨著改革開(kāi)放和市場(chǎng)經(jīng)濟(jì)在我國(guó)的不斷深入和快速發(fā)展,現(xiàn)在社會(huì)上的基礎(chǔ)建設(shè)項(xiàng)目呈現(xiàn)出持續(xù)增長(zhǎng)的態(tài)勢(shì)。質(zhì)量控制在整個(gè)水電安裝工程之中被貫穿,內(nèi)容涉及著很多方面。對(duì)于控制安裝工程之中的施工質(zhì)量,我們要將“質(zhì)量第一”這四個(gè)大字牢牢地記在心里。但是,有部分企業(yè)為了將自己公司的經(jīng)濟(jì)利益擴(kuò)到最大,對(duì)水電安裝工程之中可能存在的問(wèn)題不夠重視,忽視對(duì)其的控制和監(jiān)管,導(dǎo)致一些嚴(yán)重的工程安全事故發(fā)生。這在某種程度上,不但讓居民的日常生活受到一定安全隱患,還讓國(guó)家承受了重大的經(jīng)濟(jì)損失。鑒于這些原因,必須對(duì)安裝工程之中的施工質(zhì)量加大力度進(jìn)行控制,盡量對(duì)施工能夠達(dá)到預(yù)期的質(zhì)量目標(biāo)加以保證,才能保證我國(guó)經(jīng)濟(jì)發(fā)展得穩(wěn)定、快速和健康。

2、水電安裝工程施工質(zhì)量中的影響因素

2.1人員

施工人員所擁有的整體素質(zhì),是水電安裝的關(guān)鍵,它是影響工程完成之后質(zhì)量到底如何的重要因素之一,在工程的進(jìn)行過(guò)程之中,人為操縱這個(gè)因素貫穿著所有的環(huán)節(jié),所以,把施工人員的專業(yè)技術(shù)和道德政治素質(zhì)加以提高是非常有必要的,因?yàn)椤跋胍a(chǎn)的產(chǎn)品擁有高質(zhì)量,生產(chǎn)的人才也必須擁有高質(zhì)量”。但實(shí)際施工之中,因違背規(guī)章胡亂用電而導(dǎo)致重大事故的案例并不少見(jiàn)。因而使用素質(zhì)低下的工作人員不但讓工程得不到質(zhì)量保障,更會(huì)威脅到人民的生命財(cái)產(chǎn)安全。

2.2施工工具、方法以及施工機(jī)械

第一,要對(duì)施工方案以及施工方案的設(shè)計(jì)還有制定施工工藝的合理性進(jìn)行確立,一些水電安裝工程經(jīng)常盲目的進(jìn)行施工,施工設(shè)計(jì)方案并沒(méi)有進(jìn)行細(xì)致的可行性研究。這樣的工程在施工進(jìn)度上相對(duì)緩慢,工程完成之后的質(zhì)量也很難得到保證。因此,但我們?cè)谥贫ㄋ姲惭b工程相關(guān)施工方案的時(shí)候,必須和最先進(jìn)的水電安裝技術(shù)加以結(jié)合,并事先對(duì)設(shè)計(jì)方案進(jìn)行一系列的可行性研究和綜合性評(píng)定,以能夠?qū)こ藤|(zhì)量實(shí)施有力的保障。第二,對(duì)機(jī)械工具、設(shè)備進(jìn)行合理的使用和選擇,這也是重要的施工質(zhì)量保證因素之一。在使用和選擇機(jī)械設(shè)備的時(shí)候,我們需要對(duì)幾個(gè)方面進(jìn)行綜合性的考慮。首先,技術(shù)的先進(jìn)性,只有采取最先進(jìn)的技術(shù)手段,才能保證機(jī)械設(shè)備的優(yōu)越性和高效性,從而使施工效率得到極大的提高。其次,實(shí)用性是否可靠,在使用設(shè)備的過(guò)程里面,我們首先要保證設(shè)備是可靠安全的,才能保證施工工序可以進(jìn)行得順利。最后,是否經(jīng)濟(jì)適用,就需在保證設(shè)備可以滿足施工要求和技術(shù)要求的基礎(chǔ)之上,用最小的成本換取最大的利益。

3、容易出現(xiàn)在水電安裝工程之中的質(zhì)量問(wèn)題

首先,在現(xiàn)代社會(huì)的水電安裝工程之中,因?yàn)榇蟛糠质┕T工都只有非常淺薄的質(zhì)量安全意識(shí)和社會(huì)責(zé)任心,所以經(jīng)常會(huì)有安全事故的發(fā)生,而造成這些事故的原因,很大部分是員工操作并沒(méi)有按照規(guī)定的規(guī)章制度和安裝流程進(jìn)行。其次,有一部分開(kāi)發(fā)商為了把施工成本降到最低,獲取更多的經(jīng)濟(jì)利益,選用材料的時(shí)候以次充好,購(gòu)買質(zhì)量根本無(wú)法過(guò)關(guān)的管材,最后使得管道使用不久之后就出現(xiàn)破裂或者生銹,給居民的日常生活帶來(lái)了很大的麻煩,部分用戶還因不滿對(duì)此進(jìn)行投訴。再者,更應(yīng)引起我們重視的是,為了成本的節(jié)約,有些開(kāi)發(fā)商在引進(jìn)施工人員的問(wèn)題上,并沒(méi)有對(duì)從業(yè)人員是否專業(yè)進(jìn)行考察,有些施工人員在水電安裝施工的相關(guān)專業(yè)問(wèn)題上根本了解不多,為日后水電工程施工埋下了重大的安全質(zhì)量隱患。除開(kāi)這幾點(diǎn)之外,在施工中還要很多問(wèn)題需要注意,比如多支亂穿線、操作不能規(guī)范、不作護(hù)口、一管多股等,都要被重點(diǎn)注意。

4、控制水電安裝施工質(zhì)量的措施

4.1加強(qiáng)人員培訓(xùn),提高其綜合素質(zhì)

水電安裝工程的各項(xiàng)工作都不能離開(kāi)人的操作,因此,在施工過(guò)程之中,人扮演著非常重要的角色。在控制水電安裝工程時(shí),施工企業(yè)需要對(duì)施工人員定期進(jìn)行思想政治以及技能方面的培訓(xùn),使施工人員的技術(shù)水平和整體素質(zhì)得到提高,降低發(fā)生安全事故的機(jī)率。除此之外,企業(yè)還需要對(duì)管理方式之中的質(zhì)量責(zé)任制進(jìn)行落實(shí),也就是說(shuō)把具體責(zé)任分配到具體個(gè)人,使每個(gè)人有明確的責(zé)任范圍、施工標(biāo)準(zhǔn)和質(zhì)量職責(zé),對(duì)于操作違規(guī)的人堅(jiān)決給予其嚴(yán)厲的處分和懲罰,堅(jiān)持防范可能出現(xiàn)的問(wèn)題,使水電安裝工程日常運(yùn)作得到保障,這也能對(duì)人民的生命財(cái)產(chǎn)安全加以保證。

4.2使監(jiān)理機(jī)制得到完善,讓監(jiān)理水平得到提高

項(xiàng)目監(jiān)理在工程之中扮演著一個(gè)極其重要的角色,它不但可以使外行人對(duì)工程進(jìn)行管理造成的不良徇私現(xiàn)象得到避免,同時(shí)也可以避免施工人員在工程中擅自違背施工程序以及偷工減料的問(wèn)題。因此,工程監(jiān)理在工程中的作用應(yīng)該被我們所重視,而水電監(jiān)理大部分的監(jiān)理工作通常都是和施工工程同時(shí)進(jìn)行的,在工程最后的完工階段,監(jiān)理人員不但要配合質(zhì)量監(jiān)督、建設(shè)部門以及設(shè)計(jì)部門依次驗(yàn)收,還應(yīng)該對(duì)這段時(shí)間的工作進(jìn)行分析和總結(jié),方便以后能夠更加順利有效的開(kāi)展監(jiān)理工作。

4.3用現(xiàn)代化技術(shù)控制施工質(zhì)量

現(xiàn)代社會(huì)可以用信息技術(shù)爆發(fā)來(lái)形容,在此,我們應(yīng)該對(duì)現(xiàn)代科學(xué)技術(shù)進(jìn)行充分的利用,以此作為有效管理現(xiàn)代施工企業(yè)的手段。根據(jù)調(diào)查顯示,參與建設(shè)項(xiàng)目的任何一方在工程完工的時(shí)候手中所掌握的被記錄在案的有效文件都不到總共的65%,所以在今天這個(gè)高速發(fā)展的信息時(shí)代,我們必須對(duì)信息技術(shù)進(jìn)行充分的了解,爭(zhēng)取能夠有效、科學(xué)的對(duì)建筑項(xiàng)目進(jìn)行控制和管理。

5、總結(jié)

在現(xiàn)代社會(huì)競(jìng)爭(zhēng)如此激烈的今天,建筑企業(yè)只有保持工程項(xiàng)目的高質(zhì)量完成,才能夠在市場(chǎng)上使自己處在不敗的地位。除此之外,我們也應(yīng)該重視和注意建筑工程施工中每個(gè)環(huán)節(jié)的質(zhì)量和安全問(wèn)題,爭(zhēng)取有效保證施工項(xiàng)目能夠有效順利的進(jìn)行,并且使施工人員的安全意識(shí)得到提高。對(duì)水電安裝工程來(lái)說(shuō),其施工的質(zhì)量是非常重要的,同時(shí)也是一個(gè)重要的管理問(wèn)題,我們要一直站在企業(yè)的角度看待這個(gè)問(wèn)題,為企業(yè)的長(zhǎng)遠(yuǎn)發(fā)展和生存考慮,要將以質(zhì)取勝作為經(jīng)營(yíng)戰(zhàn)略,并以此來(lái)推動(dòng)建筑企業(yè)施工水平更快更好的發(fā)展。

參考文獻(xiàn):

[1]周晶.芻議建筑水電安裝工程施工質(zhì)量控制[J].城市建設(shè)理論研究(電子版),2011, (31).

[2]張林榮.試論建筑水電安裝工程技術(shù)問(wèn)題與預(yù)防措施[J].城市建設(shè)理論研究(電子版),2011,(36).

[3]黃樹(shù)林.水電安裝工程質(zhì)量控制[J].城市建設(shè)理論研究(電子版),2013,(15).

[4]王宏飛.淺談建筑工程中水電安裝之施工管理[J].中華民居,2012,(2):194.

[5]游曉軍.建筑水電安裝工程技術(shù)發(fā)展中的問(wèn)題及對(duì)策[J].城市建設(shè)理論研究(電子版),2013,(14).

篇4

關(guān)鍵詞:建筑;水電安裝工程;管理

中圖分類號(hào):TV211.1+4 文獻(xiàn)標(biāo)識(shí)碼:A

隨著改革開(kāi)放的深入發(fā)展,人們的生活水平有了顯著的提高,對(duì)生活質(zhì)量的要求也越來(lái)越高。在已經(jīng)交付的建筑項(xiàng)目中,很多建筑物都存在著給排水和電氣工程的滲漏、堵塞或者漏電等問(wèn)題,這些質(zhì)量問(wèn)題的存在與建筑水電安裝工程疏于管理有著直接的關(guān)系,降低了使用者的生活質(zhì)量,造成了很多不必要的麻煩。相關(guān)管理人員應(yīng)當(dāng)重視建筑水電安裝工程的管理問(wèn)題,加強(qiáng)各個(gè)環(huán)節(jié)的質(zhì)量監(jiān)督與管理,為用戶提供更多地方便。

1.建筑水電安裝工程存在的問(wèn)題

隨著建筑工程項(xiàng)目的增多,水電安裝工程施工項(xiàng)目也逐漸增多,我國(guó)建筑水電安裝技術(shù)在不斷提高,但是,在安裝施工過(guò)程中也存在著一些問(wèn)題。例如室內(nèi)水電管道壁厚度不夠,管徑太小,開(kāi)關(guān)不靈活以及預(yù)埋引入管設(shè)置不合理等,這些問(wèn)題的存在直接影響到建筑物的整理質(zhì)量。

在水電安裝工程中,在安裝布置室內(nèi)管道和衛(wèi)生間器具時(shí),難以避免出現(xiàn)滲漏的問(wèn)題,其原因主要是由于衛(wèi)生器具尺寸不達(dá)標(biāo)、施工人員認(rèn)為誤差、管道配件不符合要求等引起的。在整個(gè)工程施工中,室內(nèi)地漏、清掃口、檢查口等的安裝布置是其中重要的環(huán)節(jié),這些部位很容易發(fā)生堵塞現(xiàn)象,而造成其堵塞的原因主要是由于地漏標(biāo)高設(shè)計(jì)不合理、未設(shè)置水封、與墻面距離不符合要求等引起的,這些問(wèn)題的存在導(dǎo)致房屋內(nèi)積水無(wú)法正常排出,直接影響到用戶的使用質(zhì)量。在敷設(shè)電氣工程的管線時(shí),往往會(huì)出現(xiàn)絕緣導(dǎo)管連接套管的管徑不合適、管口尺寸不達(dá)標(biāo)、保護(hù)層過(guò)于薄以及管線缺乏牢固性等問(wèn)題。這類問(wèn)題的出現(xiàn)直接影響到了水電工程的順利施工,給居民造成一定的安全隱患。另外,在安裝電氣設(shè)備時(shí),也可能出現(xiàn)配電箱箱體與設(shè)備進(jìn)出管線布置雜亂無(wú)序、沒(méi)有穩(wěn)定固定電氣設(shè)備等這些問(wèn)題的存在,都將直接影響到建筑物的整體質(zhì)量,降低居民的生活質(zhì)量,為居民的生活帶來(lái)了一定的安全隱患。相關(guān)部門應(yīng)當(dāng)及時(shí)發(fā)現(xiàn)建筑水電安裝工程中存在的問(wèn)題,加強(qiáng)施工的管理工作,提高建筑水電安裝工程的施工質(zhì)量。

2.建筑水電安裝工程管理策略

建筑水電安裝工程的有效管理直接影響到建筑物的使用質(zhì)量,相關(guān)單位應(yīng)當(dāng)加強(qiáng)施工項(xiàng)目的組織管理,建立完善的質(zhì)量管理制度,在制度的約束下,確保每位施工人員都能夠按照相關(guān)標(biāo)準(zhǔn)要求進(jìn)行施工。

2.1安裝前期管理工作

建筑水電安裝工程的前期管理工作是整個(gè)安裝工程能否順利進(jìn)行的關(guān)鍵環(huán)節(jié)。因此,相關(guān)管理人員應(yīng)當(dāng)充分做好建筑水電安裝工程的前期管理工作,包括審核施工圖紙、材料管理和控制以及技術(shù)交底等管理工作。

建筑水電安裝工程的施工圖紙效果如何,直接影響到施工的后續(xù)環(huán)節(jié)。做好施工圖紙的審核工作,應(yīng)從以下幾方面入手:首先,要審核施工設(shè)計(jì)圖紙是否與國(guó)家相關(guān)政策規(guī)定相一致;其次,審核施工設(shè)計(jì)圖紙中的建筑結(jié)構(gòu)、管線設(shè)置以及樓板厚度等是否滿足安裝要求;最后,審核圖紙上的尺寸、坐標(biāo)、各種刊、卡架形式以及管道材質(zhì)、連接等是否符合標(biāo)準(zhǔn)要求。確定圖紙?jiān)O(shè)計(jì)符合各項(xiàng)標(biāo)準(zhǔn)要求后才能進(jìn)行施工。做好材料的管理工作,檢查安裝材料是否符合質(zhì)量要求,嚴(yán)格把好材料的質(zhì)量關(guān),確保安裝設(shè)備和材料具備合格證,符合安裝需求,對(duì)于質(zhì)量不達(dá)標(biāo)的產(chǎn)品要及時(shí)清退,以免投入使用后影響到安裝工程的質(zhì)量。在前期管理工作中,還要加強(qiáng)技術(shù)交底工作,工作人員要及時(shí)與相關(guān)部門進(jìn)行溝通和協(xié)調(diào),綜合分析工程的重點(diǎn)和要求,全面掌握安裝設(shè)計(jì)方案,對(duì)施工人員進(jìn)行技術(shù)交底,將施工方案、技術(shù)措施等詳細(xì)的向施工人員說(shuō)明,使其明確自身在安裝工作中的任務(wù)和需要注意的問(wèn)題。

2.2施工過(guò)程的管理工作

建筑水電安裝工程的施工過(guò)程是整個(gè)管理工作的重要環(huán)節(jié)。在水電安裝工程施工的過(guò)程中要加強(qiáng)以下幾方面的管理工作。

首先,加強(qiáng)電氣配管工程的質(zhì)量控制,注意土建鋼筋綁扎要與配管安裝同時(shí)進(jìn)行,確保配管在隱蔽狀態(tài)下,才能進(jìn)行砼澆注。在檢查二次預(yù)埋預(yù)留樣板時(shí),要注意檢查室內(nèi)開(kāi)關(guān)、插座、弱電終端接口的數(shù)量,查看其是否符合建筑裝飾和房間使用的要求。還要注意檢查管道路線是否按照施工圖紙要求進(jìn)行合理布置,線盒的埋設(shè)深度是否符合要求等。其次,在檢查交房樣板時(shí),要注意查看開(kāi)關(guān)、插座等于建筑裝飾的位置關(guān)系,衛(wèi)生間、廚房以及陽(yáng)臺(tái)等部位的給水管道預(yù)留情況。檢查地漏水封高度是否符合相關(guān)要求,對(duì)廚衛(wèi)通風(fēng)設(shè)施、空調(diào)室外機(jī)擱置的位置以及公共通道給水管道等的安裝施工情況進(jìn)行檢查。最后,要注意管理與控制電氣配線工程的施工質(zhì)量,重視重視螺口燈頭、插座、零線與相線接線,還要注意相線與零線的方向,避免接反現(xiàn)象的出現(xiàn),注意左零右火和上零下火的接地要求。這些細(xì)節(jié)管理問(wèn)題都將直接影響到水電安裝工程的質(zhì)量,相關(guān)管理部門要做好相應(yīng)的管理工作。

2.3工程竣工后的管理工作

建筑水電安裝工程竣工后,同樣需要涉及到一些必要的管理工作。相關(guān)管理人員要注意在工程竣工階段,配合設(shè)計(jì)單位、建設(shè)單位和質(zhì)量監(jiān)督部門做好驗(yàn)收工作,對(duì)該工程的整個(gè)施工過(guò)程進(jìn)行驗(yàn)收和總結(jié)。

3.結(jié)語(yǔ)

總而言之,建筑水電安裝工程是建筑工程的重要組成部分,相關(guān)管理人員應(yīng)當(dāng)認(rèn)識(shí)到水電安裝工程的重要性,做好安裝工程的管理工作。管理人員要從施工的整個(gè)過(guò)程入手,做好每個(gè)環(huán)節(jié)的管理工作,確保建筑水電安裝工程的質(zhì)量。

參考文獻(xiàn):

[1]甘向陽(yáng).水電安裝工程常見(jiàn)問(wèn)題及質(zhì)量控制探析[J].科學(xué)之友,2010 (14):117-119.

[2]黃炳祥.論小區(qū)住宅水電安裝工程質(zhì)量控制及防治措施[J].科技創(chuàng)新導(dǎo)報(bào),2009 (23):123-125.

篇5

關(guān)鍵詞:建筑工程;水電安裝;質(zhì)量管理

中圖分類號(hào):TU758 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):1009-2374(2014)05-0049-02

近些年來(lái),建筑產(chǎn)業(yè)的發(fā)展速度越來(lái)越快,在多種因素的綜合作用之下,比如工期較短等等,這樣就會(huì)影響到建筑工程水電安裝的質(zhì)量,在已交付使用的水電安裝工程中,出現(xiàn)各種各樣的問(wèn)題,比如開(kāi)關(guān)不靈、漏電、滲水等等,這樣就會(huì)對(duì)建筑的使用功能產(chǎn)生影響,不僅會(huì)影響到人們的正常工作和生活,還會(huì)對(duì)建筑的使用壽命產(chǎn)生影響。

1 施工圖紙的審核

在建筑施工水電安裝工程的技術(shù)準(zhǔn)備方面,非常重要的一項(xiàng)工作就是水電安裝設(shè)備的詳細(xì)審核,要知道,審圖工作的質(zhì)量,將會(huì)對(duì)安裝工程的施工產(chǎn)生很大的影響;如果在施工圖紙的審核中出現(xiàn)了問(wèn)題,那么就需要采取一系列的措施進(jìn)行修改和解決,盡量要在施工之前完成這項(xiàng)任務(wù)。具體來(lái)講,圖紙的審核需要注意這些方面的內(nèi)容:一是保證設(shè)計(jì)圖紙沒(méi)有違反國(guó)家相關(guān)技術(shù)政策和規(guī)定;二是保證設(shè)計(jì)的合理性,保證建筑的各個(gè)部分都可以協(xié)調(diào)配合,沒(méi)有矛盾存在,并且在管井尺寸、樓板厚度等方面也需要符合相關(guān)的安裝規(guī)定;三是設(shè)計(jì)圖紙與施工技術(shù)裝備條件要相符;四是對(duì)建筑施工中使用的材料進(jìn)行審核,保證其在規(guī)格、數(shù)量以及品種方面都沒(méi)有問(wèn)題;五是要保證有清楚、明確以及齊全的圖紙說(shuō)明;保證設(shè)備層以及墻壁上的預(yù)留洞、套管數(shù)量符合要求;保證正確的標(biāo)高和尺寸;選取的是合理的管道材質(zhì)以及連接方法;專業(yè)之間的管線不存在矛盾以及交圈的問(wèn)題;在管道、器具以及設(shè)備的固定方面沒(méi)有出現(xiàn)問(wèn)題,卡架的形式符合相關(guān)的要求;結(jié)構(gòu)足夠的牢固;有著十分明確的試壓標(biāo)準(zhǔn)、測(cè)試標(biāo)準(zhǔn)以及檢驗(yàn)標(biāo)準(zhǔn)等等。六是依據(jù)分項(xiàng)工程來(lái)進(jìn)行審圖,在水暖方面通常是由導(dǎo)管立管開(kāi)始,然后向器具設(shè)備等逐漸延伸;在電氣方面,接地、干管、層盤等是首先審核的對(duì)象,然后分別是器具和設(shè)備,并且保證沒(méi)有矛盾存在于審查的各個(gè)分項(xiàng)工程之間;如果在審核中發(fā)現(xiàn)了問(wèn)題,需要大家一塊兒討論,找出最優(yōu)的解決方法。

2 技術(shù)交底

眾所周知,技術(shù)交底的意義在于讓所有參與項(xiàng)目施工的人員可以詳細(xì)的了解施工對(duì)象的具體情況,比如設(shè)計(jì)細(xì)節(jié)、技術(shù)要求、結(jié)構(gòu)特點(diǎn)以及質(zhì)量標(biāo)準(zhǔn)等等,這樣以往經(jīng)常發(fā)生的技術(shù)錯(cuò)誤或者操作錯(cuò)誤都可以得到很大程度的減少。因此,就需要做好技術(shù)交底的工作,讓參與施工的工作技術(shù)人員熟悉工程設(shè)計(jì)的具體內(nèi)容以及需要注意的事項(xiàng),同時(shí),掌握具體的技術(shù)措施以及施工方案等等。這樣各個(gè)工作小組都會(huì)明確自己的任務(wù)和職責(zé),采取正確的施工技術(shù)和措施,來(lái)保證水電安裝工程的質(zhì)量。

3 施工方案的設(shè)計(jì)

相較于一般的建筑工程來(lái)講,水電安裝工程具有一些不同的特點(diǎn),比如工程多方關(guān)聯(lián)性較強(qiáng),有著較強(qiáng)的功能系統(tǒng)性;工程質(zhì)量會(huì)受到設(shè)備材料質(zhì)量很大的影響;此外,還有工程施工作業(yè)有著較高的要求以及較差施工難度較大等特點(diǎn)。

因此,在設(shè)計(jì)施工方案的時(shí)候,就需要將施工特點(diǎn)充分的納入考慮范圍,依據(jù)施工規(guī)范和驗(yàn)收規(guī)范,來(lái)對(duì)管材以及其他的附件和設(shè)備的選用進(jìn)行說(shuō)明,同時(shí),在施工方案中還需要加入其他一些內(nèi)容,比如工藝的流程、質(zhì)量標(biāo)準(zhǔn)、連接敷設(shè)的方式以及允許存在的偏差范圍等等。

4 加強(qiáng)材料以及設(shè)備的質(zhì)量控制

通過(guò)上文的敘述我們可以了解到,水電工程的質(zhì)量會(huì)在很大程度上受到設(shè)備材料質(zhì)量的影響,因?yàn)槿绻O(shè)備自身存在了問(wèn)題,那么在安裝施工的過(guò)程中,采用任何措施都是于事無(wú)補(bǔ)的。因此,要想控制水電安裝工程的質(zhì)量,非常重要的一個(gè)方面就是做好設(shè)備材料選型以及采購(gòu)等工作。管材進(jìn)場(chǎng)時(shí),施工人員需要對(duì)材料進(jìn)行必要的抽樣檢驗(yàn),保證原材料以及設(shè)備進(jìn)貨的質(zhì)量,要保證進(jìn)場(chǎng)的原材料以及設(shè)備擁有必要的質(zhì)量合格證明,同時(shí),材料和設(shè)備的材質(zhì)、型號(hào)以及規(guī)格等與設(shè)計(jì)的要求相符合,產(chǎn)品性能方面既可以滿足工程的要求,又符合國(guó)家相關(guān)的技術(shù)標(biāo)準(zhǔn)。認(rèn)真的驗(yàn)收和復(fù)試進(jìn)場(chǎng)管材,如果在驗(yàn)收中發(fā)現(xiàn)了產(chǎn)品不合格,需要采取一系列的措施進(jìn)行解決,比如及時(shí)糾正、降級(jí)使用、退貨索賠等等,這些存在問(wèn)題的產(chǎn)品是不允許進(jìn)入施工現(xiàn)場(chǎng)使用的。比如,在管道方面,需要保證裂紋、砂眼等問(wèn)題沒(méi)有不存在,壁厚的偏差在規(guī)定的范圍內(nèi),沒(méi)有損壞現(xiàn)象存在于絲扣中。管材有著十分均勻的厚度,要保證鍍鋅管內(nèi)部鍍上了鋅,需要特別注意的是不能夠存在閘閥關(guān)不嚴(yán)以及衛(wèi)生器具接口不標(biāo)準(zhǔn)的問(wèn)題。

5 對(duì)施工全過(guò)程的質(zhì)量進(jìn)行嚴(yán)格控制

要想控制水電安裝工程的質(zhì)量,非常重要的一個(gè)方面就是控制施工全過(guò)程的質(zhì)量。而要想保證施工質(zhì)量,則需要重視組織質(zhì)量檢驗(yàn)、不合格安裝產(chǎn)品糾正等工作。施工管理人員在施工指導(dǎo)時(shí),需要嚴(yán)格依據(jù)相關(guān)的施工規(guī)范和施工要求來(lái)進(jìn)行;項(xiàng)目管理人員在劃分各個(gè)工程質(zhì)量驗(yàn)收任務(wù)的時(shí)候,也需要嚴(yán)格依據(jù)相關(guān)的規(guī)范和要求來(lái)進(jìn)行,既需要對(duì)批質(zhì)量進(jìn)行檢驗(yàn)和驗(yàn)收,還需要對(duì)分項(xiàng)工程、子分部工程等進(jìn)行嚴(yán)格的質(zhì)量驗(yàn)收工作,不能放過(guò)每一個(gè)細(xì)小環(huán)節(jié)。

6 建筑施工企業(yè)水電安裝技術(shù)創(chuàng)新

在給水設(shè)備安裝方面:在安裝之前,需要核對(duì)檢查相關(guān)資料和合格證文件;結(jié)合相關(guān)的要求,對(duì)水泵房中的安裝位置以及縱橫排列形式進(jìn)行合理的規(guī)劃;在布置機(jī)組時(shí),需要保證是最短的管線和最少的彎頭,保證可以非常方便的連接管路,并且走道和空間也是需要留

設(shè)的。

在管道布置和安裝方面:管道可以分為明裝和暗裝兩種形式,明裝時(shí),需要平行于墻、梁柱等輻射。在墻內(nèi)敷設(shè)衛(wèi)生設(shè)備支管;暗裝時(shí),需要對(duì)管道及附件的安裝檢修可能性進(jìn)行考慮,盡量避免水平敷設(shè)管道,一般采用豎向敷設(shè)的辦法。

在綜合布線方面:控制金屬線槽內(nèi)導(dǎo)線總截面,要小于線槽內(nèi)截面的百分之二十,如果是垂直或者傾斜敷設(shè)線槽,那么就需要采取措施來(lái)應(yīng)對(duì)導(dǎo)線的移動(dòng)。要將護(hù)口加設(shè)于金屬管段,在箱盒處設(shè)置導(dǎo)線接頭,如果電纜、封閉式母線及金屬線槽需要換過(guò)防火墻等,就需要進(jìn)行必要的隔離。鍍鋅電纜橋架必須要有兩個(gè)以上有防松螺帽或防松墊圈的連接固定螺栓。可以將綁扎處理應(yīng)用到普通電纜中,在綁扎主要電纜方面,還需要將電纜頭套加設(shè)上去。

7 結(jié)語(yǔ)

在建筑整體工程中,十分重要的一個(gè)組成部分就是水電安裝工程,如果在水電安裝中出現(xiàn)了問(wèn)題,將會(huì)嚴(yán)重影響到建筑工程的總體質(zhì)量,因此,需要引起人們足夠的重視。選擇合適的安裝工序,控制每一個(gè)環(huán)節(jié)的施工質(zhì)量,保證建筑工程水電安裝的質(zhì)量。本文簡(jiǎn)要分析了建筑施工企業(yè)水電安裝的質(zhì)量管理和技術(shù)創(chuàng)新,希望可以提供一些有價(jià)值的參考意見(jiàn)。

參考文獻(xiàn)

[1] 李啟興.建筑工程中水電安裝技術(shù)的質(zhì)量管理分析[J].科技創(chuàng)新與應(yīng)用,2012,2(11):123-125.

[2] 何光屏.淺談建筑工程中水電安裝技術(shù)的質(zhì)量管理[J].城市建設(shè)理論研究,2011,2(26):76-78.

[3] 肖瑜.建筑工程中水電安裝施工的質(zhì)量控制措施[J].城市建設(shè)理論研究,2011,2(18):34-36.

篇6

關(guān)鍵詞:水電安裝;問(wèn)題;對(duì)策

Abstract: building hydropower installation is an important link in construction engineering, hydropower installation quality of good or bad relations with tenants, convenient and comfortable to live, Relationship with community residents living environment; Relationship with energy conservation and the overall quality of construction engineering problems. Hydropower installation project construction, the author of this paper some of the common problems were analyzed, and corresponding prevention measures are put forward.

Key words: water and electricity installation; The problem; countermeasures

中圖分類號(hào):文獻(xiàn)標(biāo)識(shí)碼:A文章編號(hào):2095-2104(2013)

引言

在城市的不斷發(fā)展和社會(huì)的不斷進(jìn)步下,人們對(duì)于生活水平、居住質(zhì)量的要求越來(lái)越高。水電安裝作為建筑工程的重要環(huán)節(jié),其安裝質(zhì)量不但影響著工程的總體質(zhì)量,還嚴(yán)重影響著人們的居住質(zhì)量和居住舒適度。在水電安裝工程中存在著一些常見(jiàn)的質(zhì)量通病,處理好這些問(wèn)題,就能確保水電安裝工程的質(zhì)量。

1水電安裝工程中的常見(jiàn)問(wèn)題

1.1管道安裝的常見(jiàn)問(wèn)題

管道安裝是給水、排水的關(guān)鍵問(wèn)題,一般常見(jiàn)的問(wèn)題有滲漏、堵塞等問(wèn)題,給人們的生活帶來(lái)了極大的不便和煩惱。在施工過(guò)程中,第一,管道的質(zhì)量問(wèn)題易造成管道安裝的施工質(zhì)量問(wèn)題。如管道的易破裂、易生銹、管壁厚度不均勻等問(wèn)題。此外,以次充好,將普通的排水管道用到建筑工地上等,嚴(yán)重影響了管道施工的質(zhì)量。其次,排水管道安裝的坡度設(shè)計(jì)不合理,造成倒坡現(xiàn)象,造成管道的阻塞。再次,管道安裝時(shí),地基的不均勻沉降為充分考慮,由于這一因素造成的管道斷裂、裂縫等問(wèn)題會(huì)導(dǎo)致管道的滲漏、堵塞。第四,施工工藝沒(méi)能嚴(yán)格安裝規(guī)定進(jìn)行。如鑄鐵排水管承插口用水泥漿抹口,連接螺母長(zhǎng)短不一、閥門安裝朝向不正確、管道接口連接不緊密等。第五,屋面水箱預(yù)埋防水套管或防水翼環(huán)制作不標(biāo)準(zhǔn)。第六,衛(wèi)生器具給水、排水配件材料質(zhì)量不合格,造成了水管安裝施工的質(zhì)量問(wèn)題。第七,由于管道安裝的位置不合理造成流水噪音大,管道易發(fā)生共振等問(wèn)題,影響了用戶正常使用。

1.2電安裝的常見(jiàn)問(wèn)題

電安裝施工的質(zhì)量不僅關(guān)系著用戶使用的方便性,還嚴(yán)重影響著使用的安全。電裝修施工的質(zhì)量問(wèn)題有可能埋下嚴(yán)重的安全隱患,因此在施工中一定要嚴(yán)肅對(duì)待。在電安裝施工中,主要的施工問(wèn)題如下所述:

1.2.1材料問(wèn)題

水電安裝施工中,安裝材料的不合格問(wèn)題較為嚴(yán)重,特別是電安裝施工中,材料問(wèn)題更為突出。第一,施工材料缺少相應(yīng)的質(zhì)量保證書。第二,施工材料入場(chǎng)把關(guān)不嚴(yán),一方面是驗(yàn)收人員不專業(yè),缺少材料驗(yàn)收的能力。另一方面是驗(yàn)收不嚴(yán)格,施工材料質(zhì)量問(wèn)題得不到充分的重視。第三,因材料和配件的使用不當(dāng)造成的材料損壞、材料性能難以發(fā)揮。

1.2.2管內(nèi)穿敷電線安裝施工問(wèn)題

在電安裝過(guò)程中,管內(nèi)穿敷電線安裝施工關(guān)系著電路的安全使用,其中存在問(wèn)題嚴(yán)重的影響著用電質(zhì)量和用電安全。第一,管內(nèi)穿過(guò)導(dǎo)線數(shù)量過(guò)多,易造成保護(hù)層的損傷、導(dǎo)線在導(dǎo)管中的交叉、糾結(jié)。第二,導(dǎo)線連接不正確。對(duì)導(dǎo)線的顏色不能明確分辨,造成線路安裝的質(zhì)量事故;導(dǎo)線連接不安規(guī)定操作,造成導(dǎo)線連接的不合格,如接觸電阻超過(guò)限額等。第三,導(dǎo)線的保護(hù)層不能起到很好的保護(hù)作用。如管線戶口處未處理,造成穿線時(shí)導(dǎo)線絕緣層的損傷。施工設(shè)計(jì)不恰當(dāng),造成配線管等,易引起配線管的損壞。起不到相應(yīng)的保護(hù)作用。

2.2.3電安裝的防雷保護(hù)設(shè)施的施工問(wèn)題

隨著城市的發(fā)展,建筑工藝、技術(shù)等不斷的發(fā)展、成熟,人類的房子越蓋越大,越蓋越高,越蓋越精美,與此同時(shí)防雷問(wèn)題也越來(lái)越嚴(yán)峻。電安裝的防雷保護(hù)施工存在的問(wèn)題主要有以下幾個(gè)方面。第一,防雷保護(hù)線設(shè)置的太低,起不到防雷的作用,易造成雷電對(duì)建筑物和電路的損壞。第二,避雷線、電器設(shè)備的接地設(shè)計(jì)不合理,造成接地線的脫落、虛接,起不到排除電危險(xiǎn)的效果。第三,接地體埋藏太淺或太深、接地體的間隔不夠、焊接面不夠、防腐處理不好等等,易造成防雷設(shè)施的虛設(shè),起不到真正的防雷保護(hù)作用。

2.2.4電器設(shè)備安裝方面的問(wèn)題

電器設(shè)備主要是指配電箱的安裝,在配電箱的安裝施工中一方面是對(duì)安裝施工的設(shè)計(jì)、分析不足,造成安裝是墻體的裂縫、設(shè)備工作時(shí)噪音大、外殼漏電等隱患。另一方面是配電箱安裝時(shí)箱蓋內(nèi)的雜物未及時(shí)清除,造成了配電箱坐標(biāo)的移位、變形等。此外,隨著人們生活水平的提高,人們對(duì)室內(nèi)裝修的要求也在不斷提高,燈具、電器等的裝修也嚴(yán)重影響著水電安裝的質(zhì)量,但在燈具安裝時(shí),水電安裝施工人員大多不在場(chǎng),電器的安裝很容易破壞水電安裝的施工成果,造成水電安裝的施工質(zhì)量問(wèn)題。

2水電安裝工程常見(jiàn)問(wèn)題的預(yù)防措施

2.1材料問(wèn)題的預(yù)防措施

材料是確保施工質(zhì)量的基礎(chǔ),因此,在水電施工中要嚴(yán)把材料質(zhì)量關(guān)。第一,對(duì)入場(chǎng)材料進(jìn)行嚴(yán)格把關(guān),認(rèn)真核實(shí)入場(chǎng)材料的質(zhì)量保證書,審核材料質(zhì)量的符合率,按要求對(duì)材料進(jìn)行抽查。第二,重視材料的存儲(chǔ)和擺放,防止材料在施工前的損壞,避免因材料存儲(chǔ)不當(dāng)造成的材料質(zhì)量問(wèn)題。如管道的日曬雨淋容易造成管道表面的損壞,影響施工質(zhì)量。第三,注意施工技術(shù)和施工順序,嚴(yán)格安裝施工規(guī)則進(jìn)行施工,避免材料在施工過(guò)程中的受損。

2.2管道的滲漏預(yù)防措施

管道的滲漏問(wèn)題的預(yù)防,首先,要嚴(yán)格控制材料的質(zhì)量問(wèn)題,確保施工材料的合格,特別是對(duì)材料砂眼等微細(xì)質(zhì)量問(wèn)題的辨別。其次,要充分考慮管道的伸縮因素,避免因管道伸縮不足造成的管道斷裂、裂縫問(wèn)題。此外,對(duì)管道的熱脹冷縮等問(wèn)題也要進(jìn)行充分的考慮,利用折角等技術(shù)做適當(dāng)?shù)念愋脱a(bǔ)償,確保管道使用的安全、可靠。再次,注意施工工藝,水管的鏈接等施工要嚴(yán)格按照施工要求進(jìn)行,確保施工的質(zhì)量。同時(shí),注重管道的鋪設(shè)布置,避免管道鋪設(shè)的雜亂無(wú)章,影響管道施工的施工質(zhì)量。

2.2管道的堵塞預(yù)防措施

預(yù)防管道的堵塞,首先,要在施工前對(duì)管道進(jìn)行清潔、疏通,確保管道內(nèi)無(wú)異物。同時(shí)注重施工場(chǎng)地雜物的清除,避免雜物進(jìn)入施工管道,影響施工質(zhì)量。其次,嚴(yán)格按照施工工藝進(jìn)行施工,確保管道施工坡度的適當(dāng)性、科學(xué)性,促進(jìn)廢水等的排泄通暢。同時(shí),注意管道封口施工,避免封口時(shí)水泥漿、泥沙等進(jìn)入管道造成管道的阻塞。再次,注重便池按照的合理性,第一,選擇合適的大便器,確保大便器與管道接口的通暢,同時(shí)注意大便器配件的質(zhì)量,避免影響管道施工的總體質(zhì)量。第二,在管道上設(shè)置檢查口和清掃口,及時(shí)清理管道的堵塞,避免管道的嚴(yán)重堵塞。第三,在施工過(guò)程中先將立管固定牢固后再進(jìn)行與排出管的鏈接,確保排污管的通暢。

2.3電安裝施工的預(yù)防措施

第一,管內(nèi)穿敷電線施工問(wèn)題的預(yù)防措施。首先,管內(nèi)穿敷電線安裝要嚴(yán)格按照規(guī)定執(zhí)行,避免內(nèi)置線路的雜亂、混淆。其次,內(nèi)穿線路安裝要認(rèn)真、仔細(xì),避免因大意造成的安裝質(zhì)量問(wèn)題。如嚴(yán)格區(qū)分導(dǎo)線顏色,避免導(dǎo)線連接的混亂。又如施工時(shí)做好回路標(biāo)記,確保線路安裝的通暢、安全。再次,及時(shí)查找漏戴,避免截面處理不全造成的導(dǎo)線劃傷。第二,防雷保護(hù)設(shè)施的安裝首先,要確保防雷帶、防雷針安裝的高度,確保防雷設(shè)施安裝的效果。其次,嚴(yán)格安裝防雷要求選擇材料和施工工藝,確保防雷設(shè)施連接的科學(xué)、有效,避免虛焊、假焊等現(xiàn)象發(fā)生。再次,注意防雷設(shè)施的接地距離,確保接地體埋地的適當(dāng)深度。第三,配電箱的安裝必須經(jīng)過(guò)科學(xué)的設(shè)計(jì),并嚴(yán)格安裝設(shè)計(jì)進(jìn)行施工,確保墻體的安全與配電箱安裝的正確、合適。此外,其他電器具的安裝必須有水電安裝人員到場(chǎng)后,才能進(jìn)行施工。避免電器具安裝對(duì)水電安裝施工質(zhì)量的影響。

3小結(jié)

水電安裝是建筑工程施工中的大事,水電安裝的質(zhì)量問(wèn)題是關(guān)系建筑物使用安全性的關(guān)鍵一環(huán),水電安裝施工存在的問(wèn)題,會(huì)給居住者、使用者的生命、財(cái)產(chǎn)安全造成嚴(yán)重的威脅。因此,在施工過(guò)程中必須確保水電施工的質(zhì)量,嚴(yán)肅對(duì)待水電安裝中可能出現(xiàn)的質(zhì)量問(wèn)題,提高水電安裝的水平,確保工程質(zhì)量,確保人們使用的安全、舒適。

參考文獻(xiàn)

篇7

關(guān)鍵詞:水電安裝 質(zhì)量監(jiān)控

隨著科技發(fā)展的日新月異,我國(guó)的建筑業(yè)也與時(shí)俱進(jìn),有了長(zhǎng)足的進(jìn)步,一些超高超大的建筑應(yīng)運(yùn)而生,人們對(duì)建筑質(zhì)量的要求也越來(lái)越高,由于水電安裝工程直接關(guān)系到工程交付后各種使用功能,且涵蓋面廣,因此,水電安裝工程的質(zhì)量控制在整個(gè)工程質(zhì)量控制中起到了至關(guān)重要的作用。

1 施工前的質(zhì)量控制措施

1.1 做好圖紙會(huì)審工作。圖紙會(huì)審是整個(gè)水電安裝工程質(zhì)量控制的重要一環(huán),要把在熟悉圖紙過(guò)程中發(fā)現(xiàn)的問(wèn)題,盡可能地消滅在工程開(kāi)工前,因此認(rèn)真做好圖紙會(huì)審,減少施工圖中的差錯(cuò),完善設(shè)計(jì)對(duì)提高工程質(zhì)量和保證施工的順利進(jìn)行具有重要意。

1.2 制定詳盡切實(shí)可行的施工方案。施工方案是工程施工中質(zhì)量控制的基礎(chǔ),是指導(dǎo)施工的綱領(lǐng)性文件,施工方案一般以單位工程中的分部或分項(xiàng)工程或一個(gè)專業(yè)工程為編制對(duì)象、內(nèi)容要契合實(shí)際,簡(jiǎn)明扼要。它主要是根據(jù)工程特點(diǎn)和具體要求對(duì)施工中的主要工序和保證工程質(zhì)量及安全技術(shù)措施、施工方法、工序配合等方面進(jìn)行合理的安排布置。

1.3 進(jìn)行一線作業(yè)人員培訓(xùn),提高施工人員素質(zhì)。要加強(qiáng)對(duì)一線作業(yè)人員的培訓(xùn)工作,提高質(zhì)量安全管理意識(shí),施工人員的素質(zhì)是整個(gè)工程質(zhì)量的關(guān)鍵因素,樹(shù)立質(zhì)量第一,預(yù)防為主的思想,保質(zhì)保量地完成水電裝置工程任務(wù)。可對(duì)質(zhì)量管理、監(jiān)督、檢測(cè)等方面工作人員進(jìn)行執(zhí)業(yè)人員資格考核,考核通過(guò)后執(zhí)證上崗。

1.4 要嚴(yán)把材料設(shè)備進(jìn)場(chǎng)關(guān)。進(jìn)場(chǎng)材料設(shè)備要嚴(yán)格控制,嚴(yán)禁質(zhì)量不達(dá)標(biāo)的材料設(shè)備進(jìn)入施工現(xiàn)場(chǎng),而且允許進(jìn)場(chǎng)的材料設(shè)備也要嚴(yán)格執(zhí)行進(jìn)場(chǎng)報(bào)驗(yàn)程序,需要復(fù)試的,必須經(jīng)過(guò)復(fù)試才能用于工程建設(shè)。

1.5 做好技術(shù)交底。施工前,要依據(jù)施工方案,對(duì)施工班組和上崗作業(yè)的施工人員做好技術(shù)交底,并要做好記錄。

2 施工中質(zhì)量控制

2.1 防雷接地。防雷工程施工常見(jiàn)問(wèn)題:①焊接的連接長(zhǎng)度和焊接質(zhì)量都不符合施工要求,焊接處存在氣孔、焊瘤、咬肉、夾渣、虛焊以及焊渣殘留等現(xiàn)象。②接地線的埋設(shè)深度不夠,室外埋設(shè)的接地線焊點(diǎn)處沒(méi)有刷防腐油漆。③接閃器和防雷網(wǎng)的支持卡子間距不符合要求,間距過(guò)大。④漏焊或錯(cuò)焊了接地鋼筋網(wǎng)連接點(diǎn),漏設(shè)了外引接地聯(lián)結(jié)點(diǎn)或檢測(cè)點(diǎn)預(yù)埋件。⑤用結(jié)構(gòu)鋼材代替避雷針(網(wǎng))及其引下線時(shí),鍍鋅層因焊接而被損壞,也沒(méi)涂刷防銹漆;沒(méi)有處理好螺栓連接的連接片,導(dǎo)致片與片之間接觸不密實(shí)等。⑥引下點(diǎn)之間的距離過(guò)大,沒(méi)有在引下線跨越變形縫的地方裝設(shè)補(bǔ)償器,也沒(méi)設(shè)置保護(hù)管保護(hù)穿墻體的線路。接地體埋設(shè)的淺,或沒(méi)有對(duì)引出線進(jìn)行防腐處理。⑦設(shè)備外殼、梯子、旗桿和管道等屋面金屬物沒(méi)有連接好屋頂防雷系統(tǒng),或等電位聯(lián)結(jié)跨接地線線徑未達(dá)到要求。

2.2 吊頂內(nèi)管線施工。由于在吊頂內(nèi)需要安裝的專業(yè)隊(duì)伍比較多,往往造成吊頂內(nèi)空間安裝不夠用,或擁擠不堪,要使吊頂內(nèi)各管線綜合布置合理、美觀,施工前要綜合全面的考慮各個(gè)專業(yè)的施工,制定詳盡的施工方案,將各個(gè)專業(yè)不同的材料設(shè)備橋架,給排水管道,消防管道,自動(dòng)噴淋管道,風(fēng)管,空調(diào)水管各管線在同一張圖的各個(gè)圖層上重疊,從而分析出位置相同的各類管線之間是否存在矛盾沖突。并繪制出管線綜合布置斷面圖,再由各專業(yè)互相配合進(jìn)一步做出合理的管線布置調(diào)整方案。

2.3 管路敷設(shè)。管路彎曲處的裂縫、折皺和凹穴等現(xiàn)象是檢查的關(guān)鍵點(diǎn);另外要看是不是根據(jù)施工要求設(shè)計(jì)的管子彎曲半徑;同時(shí)確保進(jìn)入箱、盒排管要安裝鎖扣、排列整齊,長(zhǎng)度也要相等;應(yīng)該將明配管路排列整齊,嚴(yán)格按間距、及位置要求平行或較差敷設(shè)蒸汽、熱力、煤氣和管路,同時(shí)配備隔離措施;檢查保護(hù)層是否足夠等。敷設(shè)鋼管過(guò)程中,必須剔除管內(nèi)的鐵屑和毛刺,過(guò)口要平整光滑;施工單位必須按施工要求除銹防腐;根據(jù)施工設(shè)計(jì),用金屬軟管引入設(shè)備的接頭、保護(hù)地線來(lái)連接設(shè)備和管路,用跟母和鎖扣連接箱盒和配管。

2.4 管內(nèi)穿線:根據(jù)既定的質(zhì)量要求、型號(hào)和規(guī)格選用合適的導(dǎo)線;管內(nèi)雜物在穿線前必須清理干凈;要先穿線后配管,邊敷邊穿線;穿線后要封堵垂直向上的管口;注意在管內(nèi)總截面面積中,管內(nèi)導(dǎo)線總截面只占40%以下的比例即可;一條線路的導(dǎo)線是不是要從一條管路中穿過(guò);管內(nèi)導(dǎo)線是否分色或存在接頭。連接導(dǎo)線的過(guò)程中,操作人員一定要根據(jù)型號(hào)要求選用合適的接線端子和連接管,連接質(zhì)量應(yīng)符合施工要求,以確保其不松動(dòng)和脫落;銅線要掛錫;包扎要嚴(yán)密,做好絕緣措施;剝皮時(shí)注意避免線芯被損壞;采取措施保護(hù)導(dǎo)線穿配電箱管孔;導(dǎo)線接頭要設(shè)置在接線盒里。

2.5 燈具開(kāi)關(guān)插座等器具安裝:安裝位置是否符合要求;樓板預(yù)埋燈具位置是否在房間中心;安裝是否牢固;導(dǎo)線金屬孔是否有保護(hù);燈頭相線是否反接;燈具離地面小于2.4m時(shí),金屬外殼是否做好接地;進(jìn)入吊頂內(nèi)的燈具,金屬外殼是否做好接地;露天及潮濕場(chǎng)所是否選用防水燈具等。開(kāi)關(guān)是否控制相線;搬把開(kāi)關(guān)上下與方向是否一致;安裝位置標(biāo)高是否符合要求;安裝位置與水源、煤氣距離是否滿足規(guī)定要求;潮濕場(chǎng)所是否選用防水型開(kāi)關(guān)。廚房、衛(wèi)生間插座是否選用防水防濺插座;抹灰是否污染開(kāi)關(guān)、插座;開(kāi)關(guān)、插座安裝是否牢固,是否用單一螺絲固定等。

2.6 配電箱盒安裝:選擇信譽(yù)良好的生產(chǎn)廠家,以確保配電箱盒的做工和質(zhì)量都能滿足施工要求;金屬箱一定要做好防銹防腐處理;通過(guò)氣焊或電焊的方式開(kāi)孔,必須保證一管一孔;在電氣箱內(nèi)裝設(shè)消防器件。按施工要求合理設(shè)計(jì)箱、盒裝設(shè)的位置和標(biāo)高;固定是否牢固;箱盒蓋板要嚴(yán)密,且墻面和箱盒應(yīng)該保持平正;檢查金屬架和箱體是否存在接地現(xiàn)象;做好電器可開(kāi)啟箱門的跨接地線,箱內(nèi)配線不能有接頭;注意區(qū)分保護(hù)零線和工作零線的作用和適用范圍;零線和地線端子板是不是根據(jù)線徑要求已裝設(shè)好;明確標(biāo)示配電回路名稱等。

3 施工后質(zhì)量控制

3.1 及時(shí)做好系統(tǒng)調(diào)試及聯(lián)動(dòng)試車。工程調(diào)試是鑒定系統(tǒng)設(shè)計(jì)質(zhì)量、安裝質(zhì)量及設(shè)備材料質(zhì)量的重要手段,是檢驗(yàn)各個(gè)系統(tǒng)正確性及設(shè)備性能能否達(dá)到設(shè)計(jì)控制保護(hù)要求的重要工序,是設(shè)備能否正常運(yùn)行和運(yùn)行過(guò)程中可靠性、安全性的關(guān)鍵。所以,必須加強(qiáng)系統(tǒng)調(diào)試組織和計(jì)劃工作,為工程順利竣工提供保障。

3.2 全面詳細(xì)的做好工程竣工資料。工程資料不但是記錄施工工序和實(shí)現(xiàn)科學(xué)管理的重要依據(jù),是科學(xué)技術(shù)成果的儲(chǔ)存和信息傳播的寶庫(kù),而且還是工程質(zhì)量控制、驗(yàn)收、交付使用和維修的重要檔案,是創(chuàng)優(yōu)審核不可缺少的關(guān)鍵項(xiàng)目。

3.3 認(rèn)真細(xì)致的做好質(zhì)量檢查。工程各專業(yè)要根據(jù)相關(guān)的施工規(guī)范要求,執(zhí)行施工質(zhì)量檢驗(yàn)制度,嚴(yán)格工序管理,按工序進(jìn)行質(zhì)量檢驗(yàn)和最終檢驗(yàn)試驗(yàn),并要在施工過(guò)程中做好自檢、互檢、專檢三檢制度。

篇8

【關(guān)鍵詞】建筑水電;安裝工程;質(zhì)量通病;管理措施

在居民們的生活中,水電是不可或缺的一部分,能夠?qū)ㄖ馁|(zhì)量起到非常重要的影響,是衡量建筑質(zhì)量一個(gè)非常關(guān)鍵的標(biāo)準(zhǔn)。國(guó)家及地方上的有關(guān)部門也對(duì)此非常重視,在水電安裝方面制定了一系列的規(guī)定,然而在當(dāng)前的水電安裝中難免還存在一些質(zhì)量問(wèn)題等待解決。

1建筑水電安裝工程的質(zhì)量通病

1.1建筑給排水工程的質(zhì)量通病

在所有出現(xiàn)的水電安裝問(wèn)題中,給排水系統(tǒng)是發(fā)生問(wèn)題最頻繁的,主要體現(xiàn)在:管道不通;給排水的安裝坐標(biāo)尺寸沒(méi)有依照設(shè)計(jì)圖紙的要求進(jìn)行,支架不穩(wěn),安裝不全面;給排水的管道出現(xiàn)滲水現(xiàn)象等。那么出現(xiàn)管道不通的根本原因是排水管道倒坡、在安裝過(guò)后沒(méi)有依照要求對(duì)其進(jìn)行管道檢驗(yàn)、在安裝管道的時(shí)候,沒(méi)有將其中的堵塞物清理干凈、在安裝完成之后,將施工工具遺留在管道內(nèi)、未將預(yù)留關(guān)口封嚴(yán)。出現(xiàn)給排水安裝坐標(biāo)尺寸問(wèn)題的原因在于未采用專門的管卡進(jìn)行加固、標(biāo)高尺寸把握不精準(zhǔn)和施工過(guò)程中采用的技術(shù)不一致等。而出現(xiàn)管道滲水的原因是材料的質(zhì)量不過(guò)關(guān),特別是管道銜接處不嚴(yán)密、采用的管道附件出現(xiàn)開(kāi)裂或洞眼、管道的厚薄不一致;建筑地基沉降使得管道難以承受壓力,出現(xiàn)滲水現(xiàn)象等。

1.2建筑電氣工程的質(zhì)量通病

在電氣方面經(jīng)常出現(xiàn)的問(wèn)題有:未依照設(shè)計(jì)圖紙的要求來(lái)選擇使用材料及設(shè)備、箱盒與配管銜接排列不工整、沒(méi)有依照規(guī)定來(lái)采用銜接的方法、沒(méi)有依照設(shè)計(jì)來(lái)安裝插座開(kāi)關(guān)、地線銜接沒(méi)有進(jìn)行壓接、明敷護(hù)套管槽和燈具沒(méi)有安裝牢固。而出現(xiàn)地線銜接沒(méi)有壓接、明敷護(hù)套管槽和燈具沒(méi)有安裝牢固的原因是施工方在安裝燈具和明敷護(hù)套管槽的時(shí)候采用的是木楔,并且為了節(jié)省精力采用了不恰當(dāng)?shù)倪B線方式。

2建筑水電安裝工程強(qiáng)化管理的措施

2.1加強(qiáng)施工圖紙和施工方案的審核

在進(jìn)行水電安裝的時(shí)候,首先要做好準(zhǔn)備工作,制定出恰當(dāng)?shù)氖┕し桨讣霸O(shè)計(jì)圖紙,有關(guān)單位要對(duì)其進(jìn)行嚴(yán)格的審核,這樣能夠有效保證施工的質(zhì)量。在對(duì)施工方案及設(shè)計(jì)圖紙進(jìn)行審查的時(shí)候,能夠發(fā)現(xiàn)其中的不恰當(dāng)之處,并且對(duì)發(fā)現(xiàn)的問(wèn)題進(jìn)行及時(shí)的解決。在施工中,設(shè)計(jì)圖紙起到了非常重要的作用,它是一切工作開(kāi)始的基礎(chǔ),有關(guān)部門要在施工前對(duì)圖紙進(jìn)行嚴(yán)格的審查,將施工中的每個(gè)環(huán)節(jié)都了解透徹,這樣在遇到問(wèn)題的時(shí)候才可以第一時(shí)間內(nèi)處理妥當(dāng),保證水電安裝的質(zhì)量。

2.2加強(qiáng)建筑給排水工程的管理

(1)解決排水管道漏水問(wèn)題

計(jì)算排水管道的坡度以及建筑的下沉程度,并且對(duì)其進(jìn)行分析,假如出現(xiàn)不恰當(dāng)之處,要采取有效措施予以處理。如果排水管道的坡度不合理,要將其糾正過(guò)來(lái)。在鋪設(shè)地下管道的時(shí)候要對(duì)土壤進(jìn)行檢查,不能將其安置在松軟的環(huán)境中[3]。在選擇材料和衛(wèi)生器具的時(shí)候,要嚴(yán)格檢驗(yàn)其質(zhì)量,在投入使用之前,進(jìn)行二次檢查,假如管道有裂縫或砂眼,應(yīng)當(dāng)及時(shí)和供應(yīng)商反映情況,禁止不合格的材料使用到工程中;在使用鍍鋅管的時(shí)候不能采用焊接的方式,采用質(zhì)量合格的鍍鋅配件;排水管道與配件的銜接應(yīng)當(dāng)是嚴(yán)密的,施工方在施工期間應(yīng)當(dāng)依照規(guī)定進(jìn)行安裝。

(2)解決管道堵塞問(wèn)題

在管道安裝結(jié)束后,應(yīng)當(dāng)將浴缸、馬桶等與排水管道連接的地方隔離起來(lái),避免后期施工時(shí)垃圾掉入,堵塞管道。在進(jìn)行器具的安裝前,應(yīng)當(dāng)先將管道清理干凈,保證排水系統(tǒng)的暢通,在清理干凈之后,再進(jìn)行通球試驗(yàn),選擇的球要比管道的直徑小,在其四分之三左右是最恰當(dāng)?shù)模瑢⑶蛲度氲脚潘谝院螅艿纼?nèi)注水,確保球可以通過(guò)管道,假如發(fā)生了堵塞,那么就及時(shí)進(jìn)行清理。在實(shí)驗(yàn)期間要將有關(guān)數(shù)據(jù)記錄下來(lái),為后期的工作提供方便。

2.3加強(qiáng)建筑電氣工程的管理

(1)解決配電箱問(wèn)題

在采用絲扣連接線路的過(guò)程中,應(yīng)當(dāng)用跨接的方式連接配管,并且要保證地線至少有五毫米。假如要進(jìn)行焊接,應(yīng)當(dāng)確保焊接的質(zhì)量,焊穿、焊瘤以及夾渣等問(wèn)題都不許出現(xiàn),焊接之后要清除余下的焊渣,用防銹漆來(lái)防止焊接處生銹。要確保接電線與電表箱的接地接頭是連接起來(lái)的,而不是與金屬外殼連接。直徑在五十毫米以下的鋼管一般都是用茲扣連接的方式,型鋼上不能放鋼管,鋼管口處如果有毛刺應(yīng)當(dāng)要處理,直到平整為止。在固定管道上,凡是直徑低于五十毫米的都應(yīng)當(dāng)采用螺母進(jìn)行固定,直徑在六十三毫米的時(shí)候則用點(diǎn)焊來(lái)固定。明配管的擺放要整齊。在連接塑料管的時(shí)候應(yīng)當(dāng)采用套管,這樣才可以確保塑料管不會(huì)因外力而變形。

(2)解決照明器具問(wèn)題

螺口燈頭的零線要與螺紋端口連接好,相線要和中點(diǎn)連接好,查看燈的外部有沒(méi)有損壞。當(dāng)?shù)鯚糨^重的時(shí)候,先用螺栓將其固定,確保安全,導(dǎo)線要連接準(zhǔn)確,不能觸碰到外殼。

(3)解決插座及開(kāi)關(guān)問(wèn)題

建筑內(nèi)的開(kāi)關(guān)、插座和有關(guān)的電器都應(yīng)當(dāng)要依照設(shè)計(jì)圖紙來(lái)定位,保證誤差在十五毫米之內(nèi);所有的開(kāi)關(guān)在開(kāi)啟的時(shí)候都要保證朝下;開(kāi)關(guān)與插座的位置要科學(xué),不能安排在門戶。在進(jìn)行插座和開(kāi)關(guān)接線的時(shí)候,要留下10厘米在箱中。三孔插座要遵循“左零、右火、上地”的原則。而地線要使用塑料保護(hù)套線中的一根芯設(shè)置,不能為了減少成本而節(jié)省材料,不能與其他的線一起鋪設(shè)。

3結(jié)論

綜合以上論述,水電安裝能夠提升人們的生活質(zhì)量,假如安裝質(zhì)量不過(guò)關(guān),則會(huì)大大影響到人們的正常生活。所以施工方要依照要求施工,并且參考上文分析,在安裝水電的過(guò)程中多加注意,確保水電安裝的質(zhì)量。

【參考文獻(xiàn)】

[1]陳章泉.淺談建筑工程中水電安裝質(zhì)量管理[J].建設(shè)科技,2013(18):212-213.

[2]楊泉.建筑工程水電安裝的質(zhì)量控制技術(shù)淺析[J].中國(guó)高新技術(shù)企業(yè),2013(25):131-131.

篇9

【關(guān)鍵詞】工程施工;水電安裝;工程造價(jià);跟蹤審計(jì)

所謂跟蹤審計(jì)就是工程造價(jià)咨詢單位作為專業(yè)的工程造價(jià)咨詢機(jī)構(gòu),受雇于業(yè)主,對(duì)工程造價(jià)的施工過(guò)程進(jìn)行動(dòng)態(tài)的跟蹤過(guò)程。對(duì)工程造價(jià)進(jìn)行有效審計(jì),可以提高投資效益。對(duì)水電安裝工程而言,其在施工階段造價(jià)管理上存在著些許問(wèn)題,在一定程度上影響了水電安裝工程的投資效益。因此,對(duì)水電安裝工程施工階段的造價(jià)進(jìn)行跟蹤審計(jì),是整個(gè)水電安裝工程造價(jià)管理過(guò)程中最為重要的一個(gè)階段之一,顯得尤為重要,必須要進(jìn)行認(rèn)真對(duì)待。在此,本文就施工階段的水電安裝工程造價(jià)跟蹤審計(jì)展開(kāi)簡(jiǎn)要闡述,以供參考。

1 水電安裝工程施工階段造價(jià)管理存在的問(wèn)題

1.1 水電安裝工程造價(jià)信息管理相對(duì)滯后

就水電安裝工程施工階段而言,其工程造價(jià)管理以及信息采集相對(duì)比較落后,工程造價(jià)信息的采集、加工處理、交流傳輸、共享、增值服務(wù)等各個(gè)環(huán)節(jié)的運(yùn)作水平不高,信息更新慢,致使工程項(xiàng)目中造價(jià)信息管理存在著采集標(biāo)準(zhǔn)不一、實(shí)時(shí)性比較差等問(wèn)題,難以更好地在水電安裝的造價(jià)管理中得到有效應(yīng)用。由于在造價(jià)信息管理過(guò)程中,采用電子技術(shù)相對(duì)較少,在造價(jià)管理上還是采用人工處理,這就會(huì)存在著一定的人為誤差,導(dǎo)致實(shí)際支出和預(yù)算差異比較大,從而難以實(shí)現(xiàn)對(duì)水電安裝工程的造價(jià)動(dòng)態(tài)控制,致使水電安裝造價(jià)全過(guò)程的管理得不到實(shí)現(xiàn)。

1.2 水電安裝工程計(jì)價(jià)方法不夠科學(xué)

當(dāng)前,我國(guó)的水電安裝工程都是采用通過(guò)預(yù)算確定工程造價(jià),也就是按定額計(jì)算直接費(fèi),按取費(fèi)標(biāo)準(zhǔn)計(jì)算間接費(fèi)、利潤(rùn)、稅金,再依據(jù)有關(guān)文件規(guī)定進(jìn)行調(diào)整、補(bǔ)充,最后得到工程造價(jià)。這里直接費(fèi)與間接費(fèi)的計(jì)算依據(jù),分別是參照定額的取費(fèi)標(biāo)準(zhǔn)。由于在預(yù)算過(guò)程中主要參照額定的取費(fèi)標(biāo)準(zhǔn),但在實(shí)際的安裝工程中總是不可避免地出現(xiàn)很多人為的因素、材料的因素以及設(shè)備的因素等等,所以,在預(yù)算中不可能完全適用規(guī)范和標(biāo)準(zhǔn)。

1.3 水電安裝工程造價(jià)管理的監(jiān)督機(jī)制尚需完善

在水電安裝過(guò)程中,往往會(huì)因?yàn)楦?jìng)爭(zhēng)項(xiàng)目而導(dǎo)致對(duì)造價(jià)管理監(jiān)督不規(guī)范,工程審計(jì)效果不明顯,不能滿足工程監(jiān)督的需要。即主要表現(xiàn)為以下幾個(gè)方面:(1)審計(jì)監(jiān)督不全面,無(wú)論是內(nèi)部控制還是外部審計(jì)監(jiān)督,均存在著極大的隨意性和盲目性,各自為政、互不配合、權(quán)責(zé)不清等問(wèn)題顯著,舍得審計(jì)監(jiān)督不夠全面,導(dǎo)致施工、造價(jià)管理、審計(jì)相脫節(jié),審計(jì)監(jiān)督質(zhì)量難以令人滿意。(2)審計(jì)方法不配套,一些理論上可行的審計(jì)方法不能在實(shí)際工程中得以應(yīng)用。如跟蹤設(shè)計(jì)主要是對(duì)建設(shè)項(xiàng)目的竣工結(jié)算進(jìn)行審計(jì),全面審計(jì)仍然難見(jiàn)實(shí)效,效益審計(jì)淪為空談等等。另外,當(dāng)前我國(guó)審計(jì)方面的法律法規(guī)仍不健全,這也不利于審計(jì)發(fā)揮監(jiān)督效應(yīng)。(3)工程審計(jì)人員是審計(jì)工作的直接執(zhí)行者,其綜合素質(zhì)也決定了審計(jì)工作質(zhì)量。但當(dāng)前很多建筑審計(jì)人員只是結(jié)構(gòu)相對(duì)單一,大多只是具備工程、審計(jì)、會(huì)計(jì)知識(shí)的一個(gè)方面,復(fù)合型人才嚴(yán)重缺乏,難以真正發(fā)揮出審計(jì)的監(jiān)督效應(yīng)。

2 造價(jià)跟蹤審計(jì)在工程施工階段的相關(guān)概述

2.1 跟蹤審計(jì)的原則

在開(kāi)展跟蹤審計(jì)工作時(shí),必須要對(duì)工作的目標(biāo)加以明確,并進(jìn)行合理的定位。一般,工程跟蹤審計(jì)工作需要遵循的原則有:(1)對(duì)于工程建設(shè)項(xiàng)目的進(jìn)度、質(zhì)量、投資,在跟蹤審計(jì)時(shí)必須要對(duì)具體的要求加以明確,并圍繞工程建設(shè)的目標(biāo)來(lái)開(kāi)展工作,且在對(duì)各建設(shè)目標(biāo)進(jìn)行分析和評(píng)價(jià)時(shí)應(yīng)使各建設(shè)目標(biāo)處于平衡狀態(tài);(2)在審計(jì)的過(guò)程中,要把投資控制作為中心,對(duì)建設(shè)資金的運(yùn)用進(jìn)行監(jiān)督,對(duì)投資的情況進(jìn)行控制;(3)在工程施工階段的跟蹤審計(jì)過(guò)程中,應(yīng)用價(jià)值工程理論來(lái)優(yōu)化設(shè)計(jì)方案和施工方案,提出較為合理的建議,從而最大限度的把投資效益發(fā)揮出來(lái)。

2.2 跟蹤審計(jì)的內(nèi)容

2.2.1 從造價(jià)角度協(xié)助承、發(fā)包方進(jìn)行施工組織總設(shè)計(jì)的合理優(yōu)化。

2.2.2 嚴(yán)格控制材料用量,合理確定材料價(jià)格。材料價(jià)格是影響工程成本的重要因素,嚴(yán)格控制材料價(jià)格是降低造價(jià)的有效手段。在保證材料質(zhì)量的基礎(chǔ)上,跟蹤審價(jià)人員要嚴(yán)把材料價(jià)格關(guān),即要審核施工單位提供的材料發(fā)票。對(duì)于一般材料,可根據(jù)材料供銷商、材料規(guī)格通過(guò)市場(chǎng)詢價(jià)來(lái)確定;對(duì)于特殊材料,可由造價(jià)咨詢機(jī)構(gòu)組織甲乙雙方共同向不同的供應(yīng)單位詢價(jià),以便審計(jì)人員能隨時(shí)掌握最新的投資額度。

2.2.3 為業(yè)主制定合理的資金使用計(jì)劃,確保資金專款專用,做到按工程進(jìn)度付款,對(duì)是否超出批準(zhǔn)的概算范圍投資、擠占或者虛列工程成本這些問(wèn)題的存在進(jìn)行審計(jì),以防止出現(xiàn)超付工程款現(xiàn)象。

2.2.4 工程變更、洽商、簽證的確認(rèn):工程變更發(fā)生的費(fèi)用是工程造價(jià)的重要組成部分。對(duì)施工過(guò)程中必要的變更應(yīng)首先進(jìn)行技術(shù)經(jīng)濟(jì)比較,選擇經(jīng)濟(jì)合理的技術(shù)措施,力求減少變更費(fèi)用,以避免不合理支出。同時(shí),審計(jì)人員應(yīng)協(xié)助業(yè)主及時(shí)審核設(shè)計(jì)變更單、現(xiàn)場(chǎng)簽證等發(fā)生的費(fèi)用,相應(yīng)調(diào)整造價(jià)控制目標(biāo),并協(xié)助業(yè)主做好各種不可預(yù)測(cè)因素導(dǎo)致索賠事件的預(yù)案,盡可能在事件發(fā)生后將損失降到最低限度。

2.2.5 按照項(xiàng)目招標(biāo)文件以及合同并結(jié)合現(xiàn)場(chǎng)的形象進(jìn)度,來(lái)對(duì)施工單位上報(bào)的由監(jiān)理審核過(guò)的月進(jìn)度款支付計(jì)量報(bào)表進(jìn)行核實(shí)。

2.2.6 為業(yè)主做好承包商月報(bào)造價(jià)以及各種工程驗(yàn)收資料的復(fù)核,并使其做到項(xiàng)目一完工,資料也能夠及時(shí)且完整的進(jìn)行上報(bào),從而達(dá)到順利通過(guò)竣工驗(yàn)收的目的。

3 做好水電安裝工程造價(jià)跟蹤審計(jì)的相關(guān)對(duì)策

3.1 合理分割工程的基本預(yù)算以及成本,優(yōu)化資金和資源的分配

資源的合理分配是造價(jià)管理的一個(gè)基礎(chǔ),只有在水電安裝的過(guò)程中進(jìn)行合理的把有限的資源分配的不同工序和責(zé)任人的手中,才能達(dá)到用最少的錢來(lái)把目標(biāo)完成的目的。

3.2 嚴(yán)格對(duì)施工過(guò)程進(jìn)行監(jiān)管

對(duì)施工過(guò)程進(jìn)行有效地監(jiān)管,可以有效控制工程資源的使用,防止浪費(fèi)現(xiàn)象的產(chǎn)生,從而對(duì)工程造價(jià)管理的合理性進(jìn)行保證。一般,在施工過(guò)程的監(jiān)管重點(diǎn)是施工隊(duì)的成本管理,也就是對(duì)施工隊(duì)所完成的施工項(xiàng)目的成本進(jìn)行嚴(yán)格的管理,以期其加強(qiáng)完成水電安裝的效率。在這一過(guò)程中,可以采用“責(zé)任成本核算”這一監(jiān)管方式,即把項(xiàng)目的成本細(xì)化到每一道水電安裝的工序中,由完成工序所需要的工料機(jī)費(fèi)用組成責(zé)任單價(jià),并以此作為對(duì)施工隊(duì)的成本控制情況的衡量依據(jù)。這就是說(shuō),責(zé)任成本單價(jià)與各個(gè)施工成員的直接工費(fèi)收入相掛鉤,一旦責(zé)任成本單價(jià)過(guò)高,則會(huì)相應(yīng)減少施工人員的工費(fèi),以此來(lái)約束其更好地進(jìn)行資源的控制。

3.3 嚴(yán)格對(duì)工程施工階段實(shí)行造價(jià)動(dòng)態(tài)控制管理

在水電安裝工程中,施工階段工程造價(jià)動(dòng)態(tài)控制可大大降低工程費(fèi)用且最大程度的提高實(shí)施效率,使項(xiàng)目獲得最佳進(jìn)度。因此,需要在工程中實(shí)施施工階段工程造價(jià)動(dòng)態(tài)控制,及時(shí)對(duì)照工作的實(shí)際進(jìn)度去檢查和核實(shí)各項(xiàng)費(fèi)用的實(shí)施情況,發(fā)現(xiàn)預(yù)算偏離計(jì)劃都必須采取相應(yīng)措施加以糾正。

目前,“贏得值法”作為一項(xiàng)先進(jìn)的項(xiàng)目管理技術(shù),其逐漸被我國(guó)建筑業(yè)引入,用以進(jìn)行工程項(xiàng)目的費(fèi)用預(yù)算、進(jìn)度控制。而在應(yīng)用“贏得值法”進(jìn)行成本動(dòng)態(tài)控制時(shí),須進(jìn)行進(jìn)度/成本實(shí)時(shí)監(jiān)測(cè),即其由以下幾部分組成:

3.3.1 建立工作分解結(jié)構(gòu)圖,把水電安裝工程項(xiàng)目的各項(xiàng)任務(wù)逐級(jí)進(jìn)行分解,分解任務(wù)為若干個(gè)相對(duì)獨(dú)立、內(nèi)容單一的工作單元,并依據(jù)各單元在整個(gè)項(xiàng)目中的地位及相對(duì)關(guān)系制定計(jì)劃備案,以在施工過(guò)程中配合成本分割計(jì)劃進(jìn)行動(dòng)態(tài)的管理。

3.3.2 建立好工作分解結(jié)構(gòu)圖后,即可依據(jù)分解結(jié)構(gòu)圖,估算各工序的費(fèi)用和時(shí)間,然后科學(xué)、合理地設(shè)置控制節(jié)點(diǎn)。

3.3.3 最后,在工作分解結(jié)構(gòu)圖的基礎(chǔ)上,可建立成本分解結(jié)構(gòu),也就是吧項(xiàng)目成本逐層分解到工作分解結(jié)構(gòu)圖的各級(jí)工作包上,以對(duì)成本的具體花費(fèi)進(jìn)行控制。

4 結(jié)束語(yǔ)

綜上所述,工程造價(jià)跟蹤審計(jì)是一項(xiàng)技術(shù)性、專業(yè)性很強(qiáng)的工作,它貫穿于建筑施工的全過(guò)程及竣工結(jié)算等階段,是一個(gè)動(dòng)態(tài)的管理過(guò)程。在本文中,論述了當(dāng)前水電安裝工程施工階段造價(jià)管理存在的問(wèn)題,也就跟蹤審計(jì)的原則及其內(nèi)容做了簡(jiǎn)要闡述,在文章的后面,本文還從“合理分割工程的基本預(yù)算以及成本、嚴(yán)格對(duì)施工過(guò)程進(jìn)行監(jiān)管及嚴(yán)格對(duì)工程施工階段實(shí)行造價(jià)動(dòng)態(tài)控制管理”闡述了做好水電安裝工程造價(jià)跟蹤審計(jì)的一些對(duì)策,以利于工程造價(jià)控制和提高建設(shè)資金的使用率。可以說(shuō),跟蹤審計(jì)管理是工程造價(jià)行業(yè)發(fā)展的必然趨勢(shì),是造價(jià)行業(yè)適應(yīng)市場(chǎng)經(jīng)濟(jì)發(fā)展的必然結(jié)果。

參考文獻(xiàn):

[1]胡彩宣.施工階段工程造價(jià)的跟蹤審計(jì)[J].企業(yè)科技與發(fā)展,2011(19).

篇10

[關(guān)鍵詞]水電安裝施工技術(shù) 管理

隨著社會(huì)主義市場(chǎng)經(jīng)濟(jì)的發(fā)展,水電安裝工程技術(shù)取得很大的突破;作為建筑工程的一個(gè)重要環(huán)節(jié),建筑給排水、電氣安裝是建筑工程的有機(jī)組成部分,管道的跑、漏、堵、開(kāi)關(guān)不靈敏、漏電等問(wèn)題均影響功能的正常使用。輕則給人們帶來(lái)一些小的不便與煩惱,重則影響建筑物的使用壽命。國(guó)家有關(guān)部門和地方部門設(shè)定了方案,對(duì)21世紀(jì)的水電安裝行業(yè),務(wù)必要牢牢抓住機(jī)遇,不斷推進(jìn)安裝工程施工技術(shù)的創(chuàng)新與管理的創(chuàng)新,進(jìn)一步完善水電安裝的方法,進(jìn)一步改進(jìn)建筑水電工程的質(zhì)量。下面從以下幾個(gè)方面來(lái)說(shuō)明水電安裝工程施工技術(shù)和管理。

一、對(duì)水電施工圖紙的審核

審核圖紙是工程施工技術(shù)準(zhǔn)備工作的一項(xiàng)重要內(nèi)容,審核圖紙也是施工的重要依劇所在,只有對(duì)施工的圖紙?jiān)敿?xì)并仔細(xì)的審核,才能使施工中各系統(tǒng)以及各個(gè)環(huán)節(jié)做到心中有數(shù),這樣才能及時(shí)的找出問(wèn)題,發(fā)現(xiàn)問(wèn)題,又能及時(shí)的改正錯(cuò)誤,糾正錯(cuò)誤。平面圖是否與系統(tǒng)圖相同,做到對(duì)施工質(zhì)量的預(yù)控。施工人員一拿到圖紙后,先查看圖紙是否齊全,并根據(jù)專業(yè)施工的需要做第二次查看。在施工過(guò)程中,避免有缺圖的出現(xiàn),造成停工現(xiàn)象的發(fā)生。查看設(shè)計(jì)中的圖紙是否有其它規(guī)范的規(guī)定以及技術(shù)標(biāo)準(zhǔn)要求。對(duì)預(yù)留圖紙的繪制,現(xiàn)場(chǎng)的預(yù)留要做好,施工在實(shí)體中,要求嚴(yán)格根據(jù)預(yù)留、預(yù)埋的詳圖進(jìn)行預(yù)留、預(yù)埋。應(yīng)根據(jù)預(yù)留、預(yù)埋的詳圖嚴(yán)格細(xì)致地進(jìn)行檢查。

二、施工中組織設(shè)計(jì)內(nèi)容的編制和要求

“施工組織設(shè)計(jì)”是一份引領(lǐng)施工安裝的重要文件。施工中都是通過(guò)“施工組織設(shè)計(jì)”的要求來(lái)安排實(shí)施的。但是目前普遍存在的問(wèn)題是“施工組織設(shè)計(jì)”缺乏針對(duì)性及操作性。要真正做到引領(lǐng)施工,編制的內(nèi)容要做到以下幾點(diǎn):

1、工程概述

簡(jiǎn)單抄寫設(shè)計(jì)說(shuō)明是毫無(wú)意義的,應(yīng)該把整個(gè)工程的建筑形式介紹的清清楚楚。打個(gè)比方:房屋建設(shè)工程的樓層高和房屋結(jié)構(gòu)做法,一般都注重房間的衛(wèi)生間與廚房間的做法,但要交待清楚,另外對(duì)工程承包的范圍以及施工特點(diǎn)做進(jìn)一步的介紹。編制內(nèi)容的依據(jù)必須是有效的施工協(xié)議,施工的圖紙。

2、施工前的準(zhǔn)備

(1)技術(shù)準(zhǔn)備,體現(xiàn)了技術(shù)的先進(jìn),里面涵蓋了會(huì)審的圖紙、編制施工組織內(nèi)容以及技術(shù)方面的內(nèi)容。圖紙的審核要根據(jù)自已審核專業(yè)圖紙的情況下,提出明確的要求。 (2) 物質(zhì)準(zhǔn)備,要清楚材料及設(shè)備采購(gòu)的地點(diǎn)、供應(yīng)的方法,選用的設(shè)備和小型工具的數(shù)量以及計(jì)劃按排進(jìn)場(chǎng)的時(shí)間。(3)施工現(xiàn)場(chǎng)準(zhǔn)備,因?yàn)樗姸际欠职こ蹋仨毾蚩偝邪鼏挝惶岢鏊枰牟牧弦约岸逊诺膱?chǎng)地,現(xiàn)場(chǎng)的休息和辦公用房。(4)施工人員,明確管理人員及施工班組的組成。

3、施工技術(shù)的方案

施工技術(shù)方案是“施工組織設(shè)計(jì)”的重要組成部分,也是施工組織設(shè)計(jì)中最核心的內(nèi)容之一,根據(jù)施工分成幾項(xiàng)工程來(lái)編制,按照施工的特點(diǎn),尤其需要強(qiáng)調(diào)對(duì)工序搭接的問(wèn)題,以及要重點(diǎn)控制的部分,如輕質(zhì)墻上管道器具怎樣穩(wěn)裝,保溫墻上散熱器及管道電盒如何固定牢固。

4、施工進(jìn)度計(jì)劃

不能盲目的根據(jù)土地建設(shè)的進(jìn)度把它編制出來(lái),應(yīng)該按照本設(shè)計(jì)施工中所需用的工序搭接,以及按照短期性工期要求、總工期要求進(jìn)行安排。要妥善合理的安排好施工的順序及工序如何搭接;勞動(dòng)的用工數(shù)都是通過(guò)勞動(dòng)定額計(jì)算出來(lái)的,工序搭接的合理是通過(guò)組織人員編制策劃出來(lái)的,工作小組要穩(wěn)定,工程要保質(zhì)保量,生產(chǎn)效率要提高,把工期縮減到最短,施工進(jìn)度計(jì)劃圖表要求畫出來(lái),由預(yù)算員在編制時(shí)提供工程量和用工的天數(shù),進(jìn)度計(jì)劃圖表要求計(jì)劃員畫出來(lái),再由技術(shù)人員進(jìn)行總結(jié)。

二、加強(qiáng)水電安裝和施工的技術(shù)管理

1、對(duì)施工組織進(jìn)行嚴(yán)格管理。施工的方法方案是重要的一個(gè)環(huán)節(jié),對(duì)工程的質(zhì)量保證至關(guān)重要。在工程開(kāi)始動(dòng)工之前,對(duì)設(shè)計(jì)圖紙,工程技術(shù)人員應(yīng)該要非常的重視,要做到自己嚴(yán)格審核。對(duì)復(fù)雜的線路及交叉口多的地方進(jìn)行重點(diǎn)審查并做再次審查,施工方案的合理性、實(shí)用性及對(duì)工程質(zhì)量的預(yù)控能力,工作人員要注意。從施工方案編制的角度看,工作人員要深度的去領(lǐng)會(huì),確保工程質(zhì)量的嚴(yán)格性。

2、嚴(yán)格對(duì)材料和設(shè)備的質(zhì)量控制。保證工程質(zhì)量取決于材料設(shè)備的質(zhì)量,設(shè)備的缺陷是無(wú)法通過(guò)施工過(guò)程安裝來(lái)改正和彌補(bǔ)的。所以,安裝施工工程質(zhì)量的第一個(gè)關(guān)鍵點(diǎn)是選好設(shè)備材料。材料進(jìn)入施工場(chǎng)地時(shí),施工人員應(yīng)對(duì)材料進(jìn)行抽樣檢驗(yàn),嚴(yán)格把好原材料質(zhì)量關(guān),采購(gòu)進(jìn)場(chǎng)的設(shè)備以及原材料應(yīng)該有廠家的質(zhì)量合格證,原材料應(yīng)該符合國(guó)家標(biāo)準(zhǔn),不合格的嚴(yán)禁進(jìn)入施工場(chǎng)地,切勿使用,如沒(méi)有對(duì)原材料查出,紕漏,一旦施工途中出現(xiàn)問(wèn)題,要求材料供方所賠。

3、加強(qiáng)溝通協(xié)調(diào)工作。溝通是施工當(dāng)中最重要的帶,做好溝通和協(xié)調(diào)是施工人員和技術(shù)人員所具備的。工作要全面的考慮各方面注意的問(wèn)題、制訂的方案、技術(shù)措施,施工人員以及技術(shù)人員平時(shí)多交流,并使施工的任務(wù)更明確化,使工程質(zhì)量得以保證。如客廳、房間等做樣板是按設(shè)計(jì)圖來(lái)的。對(duì)樣板的施工,可以及時(shí)發(fā)現(xiàn)問(wèn)題,在施工中盡量避免問(wèn)題,以便對(duì)工程質(zhì)量造成不良的影響,趕不上施工的進(jìn)度。

4、水電安裝與土地建設(shè)應(yīng)該相互配合協(xié)調(diào)。水電安裝施工的重要基礎(chǔ)是土地建設(shè),土地建設(shè)的質(zhì)量好壞對(duì)水電的安裝和施工產(chǎn)生重要的影響。水電安裝與土地建設(shè)相互協(xié)調(diào)配合,是施工整體工程質(zhì)量得到肯定的前提,技術(shù)人員和施工人員應(yīng)該在施工前,對(duì)圖紙仔細(xì)認(rèn)真的審核,施工中對(duì)出現(xiàn)的問(wèn)題,應(yīng)該加以處理解決。施工實(shí)行后,要不定時(shí)的與土地建設(shè)人員開(kāi)會(huì)互相溝通,對(duì)出現(xiàn)的問(wèn)題進(jìn)行探討,兩者的問(wèn)題要協(xié)調(diào)好,從而使兩個(gè)在施工方法上和標(biāo)準(zhǔn)質(zhì)量上要相符合,確保安裝水電和施工工程的質(zhì)量能夠正常有序的運(yùn)行。

5、嚴(yán)格制定質(zhì)量的檢驗(yàn)標(biāo)準(zhǔn)。在施工階段,水電安裝要嚴(yán)格認(rèn)真地對(duì)施工工序交接的檢驗(yàn),并對(duì)制度的實(shí)施,上一個(gè)工序環(huán)節(jié)不符合要求就不能緊接著下一個(gè)工序。各種施工抽樣試驗(yàn)以及隱性的檢驗(yàn)工作要做好,都是通過(guò)國(guó)家標(biāo)準(zhǔn)的項(xiàng)目質(zhì)量進(jìn)行檢驗(yàn)的,施工過(guò)程中檢測(cè)次數(shù)要進(jìn)一步增加以及更全面性,將原先不定時(shí)的抽查改為全面的檢測(cè),如有發(fā)現(xiàn)問(wèn)題及時(shí)通知上級(jí)領(lǐng)導(dǎo)立即整改,不能延誤。